Forum quick links
Furniture heights
CI-v4 EQc8:Quality viewsposted by Subramaniam Chandrasekaran on
exactly same as the below mentioned point; for a project, the interior designer wants to know whether they have to go with 1050 mm or 1100 mm of workstation height; this clarification answers; but
Pilot Program
EBOM-v4 EAp2:Minimum energy performanceposted by Meier Corporate Account on
Good Afternoon, We cannot complete the existing credit as we cannot meet any of the Cases / Options. There is no Energy Star rating for dairies...
Pilot credit: No Cooling Tower [ v4 - bc+d)
NC-v4 INc1:Innovationposted by Ydo Schuuring on
Hello, For a project no coolingtowers are used. There for we have the possibility to achieve the Pilot credit No Cooling Tower.
Alarm to closed openings
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vitor Tosetto on
Dears, When we have a Naturally Ventilated Space, we can use an alarm to indicate that the openings are close. Someone know if I can use an light alarm? or I must use an sound alarm?
Pre-Consumer Recycled Content
EBOM-v4 MRc1:Purchasing - ongoingposted by Claire Bannister on
How is pre-consumer recycled content calculated in v4? In v2009, there were columns for both pre- and post- consumer.
NC V4: Thermal Comfort
NC-v4 EQc5:Thermal comfortposted by Erik Gutierrez on
Hello, I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. To be specific, the new construction is a restaurant.
Compost as an additional recyclable
NC-v4 MRp1:Storage and collection of recyclablesposted by Sara Zoumbaris on
Our project has company-wide recycling programs set up which collect batteries, mercury containing lamps AND electronic waste, however the collection boxes are not out in the open as the collection
Minimum Weekday/Weekend Trips
NC-v4 LTc5:Access to quality transitposted by Kevin Dunphy on
I am looking for clarification on the terminology and corresponding input fields of the credit form.
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
Campus project with central plant
NC-v4 EAc4:Demand responseposted by Brightworks Sustainability on
Our project is a student dorm on a university campus.