Additional Enhanced IAQ Strategies

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Marina Curto  on 

In this credit, two options are available, Options 1 and 2. Can a project achieve Option 2 only without pursuing Option 1?

1
Thu Jul 20, 2017, 10:33 pm

Sounds transmission - Ceilings and Floors

NC-v4 EQc9:Acoustic performance
posted by  Adam Stoker  on 

The LEED v4 acoustics calculator expands on the guidance provided in the credit and reference guide with respect to the sound transmission requirements and associated calculations.

1
Fri Oct 28, 2016, 3:30 pm

Data center - Baseline HVAC System

NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Hi Markus and all coleagues, In the Data center I'm about to start modeling, there are 4 IP rooms. Each of these rooms has IP load with a power density of 3.2 kW/m2 or 297 W/ft2.

1
Tue Sep 2, 2014, 1:18 pm

Exemplary Performance Over 95% Diverted

NC-v4 MRc5:Construction and demolition waste management
posted by  Cynthia Kaplan  on 

Has this bonus point gone away? There is no longer a point awarded for achieving a diverted rate over 95%?

1
Sun Sep 25, 2016, 3:12 pm

Cycle lane between project and Bicycle Network

NC-v4 LTc6:Bicycle facilities
posted by  Alicia Costas Freire  on 

Hello, My understanding from the LEED manual is that the credit does not require provision of a dedicated cycle lane between the building and the bicycle network and I was wondering if someone cou

1
Tue Nov 3, 2015, 11:03 pm

Air Barrier for Existing Building

NC-v4 EAp2:Minimum energy performance
posted by  Martin Meehan  on 

Hi all, This query follows on a similar theme to the previous topic. We are working on an existing building that is intending to improve the envelop performance by internally adding insulation to

1
Tue Apr 11, 2017, 1:29 pm

Process water and residential units

NC-v4 WEp2:Indoor water use reduction
posted by  MAUDE PINTAL  on 

Our project includes a community center and a multi-residential part.

0

Can I omit the IP credit since it is stand alone?

NC-v4 IPc1:Integrative process
posted by  wachira sosaeng  on 

Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.

1
Mon Aug 1, 2016, 3:21 pm

Surrounding density and Diverse Uses

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Tim Bell  on 

I am currently working on a major project in South Africa that will provide diverse uses to the building occupants only as the site is fully enclosed for security reasons.

1
Thu Mar 10, 2016, 3:48 pm

Enhanced IAQ Strategies - Hazardous Gases/Chemicals

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Mark Zoeteman  on 

Option 1, Enhanced IAQ Strategies, paragraph B states spaces are to be exhausted where hazardous gases or chemicals may be present or used.

1