Forum quick links
calculating FTE
Schools-NC-v4 WEp2:Indoor water use reductionposted by Charli Holt on
I am working on a project in Hammond, LA for a university. The building is 2,000 sqft and is a "teaching sustainability center". I am unsure on how to calculate the FTE's for WEp2 etc.
Shuttle Service Still Eligible?
CI-v4 LTc3:Access to quality transitposted by Brian Salazar on
Under v3, if a shuttle service was provided by the employer or landlord within 2 miles of a major transit hub such as light rail, bus terminal, or commuter rail, a project would be awarded these po
Acoustic performance
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by neeraj arora on
How to calculate composite STC for a room?
LEED NC - v4 MRc3 Wood products
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sandra Closson on
The language of NC v4 does not specifically call out new wood. "Wood products must be certified by the Forest Stewardship Council or USGBC-approved equivalent.
NC-v4: Rainwater management
NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project? The initial pond will be des
DES in non-roof measures
CS-v4 SSc5:Heat island reductionposted by on
Hello, I am working in a DES heating and cooling thanks to sea water and I would like to know if it is taking in account as a non-roof measure.
Energy performance vs. Energy Cost
Mid-Rise-v4 EAc1:Annual energy useposted by Eesmyal Santos-Brault on
Hi - It seems that this version of the rating system is targeting energy performance improvement over energy cost budget. Is that right?
Brownfield site
Hospitality-NC-v4 LTc3:High priority siteposted by Karen Heet on
Howdy! Can this credit be achieved if the project is on a former brownfield site - meaning that it was identified and already remediated by the previous owner? Many thanks!
Confidential space
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Ameet AA on
Hi, The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area.
Who can be the CxA?
CI-v4 EAc1:Enhanced commissioningposted by emily reese moody on
Under v3, if a project wanted to pursue the enhanced Cx credit, a third-party CxA was required, and that entity completed the activities for both the prerequisite and the enhanced credit. Have the