Forum quick links
Private vs. Public
NC-v4 WEp2:Indoor water use reductionposted by Lorne Mlotek on
why do a private lavoratory faucet have a higher rate than a public under the EPAct 2.2 vs 0.5?
Enhanced Refrigerant Mgmt credit
NC-v4 EAc6:Enhanced refrigerant managementposted by Michelle Markus on
The ‘Enhanced Refrigerant Management’ credit it mentions a formula to comply with in order to be eligible for the point.
Green walls
NC-v4 WEc1:Outdoor water use reductionposted by Julien Richard on
Hi, Do we have to include green walls in the calculation ?
1-Existing to Remain Parking Space, Reserved for ADA
NC-v4 LTc7:Reduced parking footprintposted by Sara Zoumbaris on
Hello, We have a project that will designate the 1-existing parking space for ADA upon project completion.
Negative value of Monthly Landscape water requirement?
NC-v4 WEp1:Outdoor water use reductionposted by Francesco Passerini on
Dear all, I am performing the calculation for the Water Outdoor Prerequisite, with both excel for a Project located in Italy (Rome): 1. Water budget tool (downloaded from EPA) 2.
car wash by hand (manual car wash) at a car dealership
CI-v4 WEp1:Indoor water use reductionposted by Kristen Magnuson on
Community, I am assuming we are safe to exclude a sink being used for a manual car washing station (hand-wash carwash) at a car dealership.
Temporary Materials - Formwork
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on
The materials credits apply to components that are permanently installed in the building.
LEED V4 - TENANT SPACE ENERGY MODELING
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi, Regarding the Energy Performance Calculator that should be used instead of Table 1.4, my questions are: 1.
Smart irrigation controls
NC-v4 WEc1:Outdoor water use reductionposted by soha yamani on
Hello , in step 6 it is mentioned to Count only irrigation controls whose smart-sensor technology meets the WaterSense criteria, and that it automatically reduce 15% off the baseline , my question
Documentation for Plan
ND-Plan-v4 GIBp1:Certified green buildingposted by David West on
For certification of at the plan stage I assume that GBCI doesn't expect a building to be constructed and certified.