Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Minimum light levels are now required

NC-v4 SSc6:Light pollution reduction
posted by  Bill Swanson  on 

This has come up on a project and we lost on appeal so I'm sharing this information with everyone. Any area being claimed in the wattage baseline calculation must be illuminated to a minimum light

0

Sea Water Cooled Chiller Modeling

NC-v4 EAp2:Minimum energy performance
posted by  Sefa Sahin  on 

Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.

1
Wed Apr 26, 2017, 1:45 pm

Heat Island Reduction

EBOM-v4 SSc3:Heat island reduction
posted by  VISHESH AGARWAL  on 

Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2

0

n/a

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Biao Ma  on 

I want to know if vertical green wall with native and local plant species, whether or not can conribute the green ratio for option 1.

1
Tue Jul 25, 2017, 11:03 pm

Compartmentalization

NC-v4 EQp2:Environmental tobacco smoke control
posted by  soha yamani  on 

I am really confused with the language of this credit , can you please clarify the below 1- Does EACH unit have to be sealed and Compartmentalized or only Residential units allowing smoking?

1
Wed May 17, 2017, 3:31 pm

Existing Conditions

NC-v4 WEp1:Outdoor water use reduction
posted by  Craig Graber  on 

This is Josef Abboud from Atelier Ten For outdoor areas within a renovation project scope (i.e.

1
Tue Apr 12, 2016, 3:19 pm

University Campus with Solar, not in Project LPB

CI-v4 EAc4:Renewable energy production
posted by  Sara Zoumbaris  on 

Our project is the renovation of an existing university building.

1
Mon Aug 28, 2017, 2:11 pm

Concrete and Asphalt from Demolition

NC-v4 MRc5:Construction and demolition waste management
posted by  James Keohane  on 

What is the best way to include demolition materials such as concrete and asphalt in CWM calculation?

1
Mon May 8, 2017, 4:54 pm

2 buildings = 100% = 5 points?

ND-v4 GIBc1:Certified green buildings
posted by  Tommy Linstroth  on 

We are looking at doing 2 multi-family low-rise buildings. Each building would be LEED for Homes certified - so 100% of the floor area would be certified over 69 units.

1
Thu May 26, 2016, 10:26 pm

timeframe of applicable products

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  emily reese moody  on 

I swear I saw this info somewhere, but cannot locate it now. What's the timeframe of product purchase in terms of applicability for this credit (and inclusion with LEED documentation/compliance in

0