Forum quick links
Onsite solar PV generation - 10 years contract
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Ameet AA on
Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?
ID+C - EQ Credit Interior Lighting - Lighting Sales areas
Retail-CI-v4 EQc6:Interior lightingposted by Valentin Grimaud on
HI, I am working on a store with two lighting types: furniture lighting and ambiant lighting. Only a part of the ambiant lighting is controlled depending on daylight illumination (40%).
Equipment in Table 3... all or none?
Retail-NC-v4 WEc2:Indoor water use reductionposted by Greg Romanczyk on
Our project serves > 100 meals a day, therefore, Table 3 commercial kitchen equipment applies.
Section 1504.4 doesn't exist
Homes-v4 EQp1:Ventilationposted by Gustavo De las Heras Izquierdo on
Has anyone tried to read "Section 1504.4 of the 2009 International Residential Code". This section doesn't exist, and Section 1504 deals with microwaves oven.
Applicability within campus boundary limits
NC-v4 SSp1:Construction activity pollution preventionposted by Samer Alhmdan on
Hello, I have multiple buildings within a campus, do we need to implement this prerequisite within the whole campus boundaries, or only within buildings LEED boundaries, noting that there are some
Option 2 applicability to a Shopping Mall larger than 9290 m2
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi all, I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell).
How to calculate Floor Area to be Ventilated?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vitor Tosetto on
Dear, I have one more question, please. In ASHRAE 62.1-2010 section 6.4.1 there is an explantion about floor area to be ventilated.
Automatic Receptacle Control
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Mena on
Hi, We have a CI project in Mexico City, for the receptacle control we are specifying 50%of private and open offices with a timer.
Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Donny Goris-Kolb on
Guidance states "If restrooms are not provided for customers within the retail project,.." If the store's restrooms are intended for employee use, but employees are directed to grant customers acce
Composting
EBOM-v4 MRc4:Solid waste management - ongoingposted by Claire Bannister on
Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?