Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Cutsheet unavailable

EBOM-v4 WEp1:Indoor water use reduction
posted by  Charalampos Giannikopoulos  on 

If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fix

1
Tue Feb 24, 2015, 11:10 pm

Which parameters of the cooling tower?

NC-v4 WEc3:Cooling tower water use
posted by  Jade Deltour  on 

Which parameters/performances of the cooling tower need to be checked/optimised to limit tower cycles to avoid exceeding maximum values?

0

CSR following UN Global Compact

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Ana García  on 

Hello! U.N. Global Compact - Communication of Progress is a LEED compliant CSR frameworks.

1
Wed Nov 11, 2015, 4:20 pm

Building's equipment still uncertain

NC-v4 EAc3:Advanced energy metering
posted by  Maria Matos  on 

Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.

1
Wed Apr 12, 2017, 1:35 pm

Is a Rollout Mat considered a permanent entryway system?

EBOM-v4 EQc2:Enhanced indoor air quality strategies
posted by  Tim Nabholz  on 

According to the language provided for the credit: "Acceptable entryway systems include permanently installed grates, grilles, slotted systems that allow for cleaning underneath, rollout mats, and

1
Thu Mar 24, 2016, 9:08 pm

Access to quality transit

NC-v4 LTc5:Access to quality transit
posted by  Subrota Roy  on 

Hi, I want to know clearly what is Access to quality transit? Also how can i achieved this credit point for LEED NC v4. Pls share with me compliance path,what type of documentation needed?

1
Thu Jun 8, 2017, 1:28 pm

Discharging Storm water at a later stage

CS-v4 SSc4:Rainwater management
posted by  Patrice McVeigh  on 

Under Version 3 is was acceptable to retain storm water run-off in tanks to discharge in to storm water sewers at a later date, is this still acceptable under V4?

1
Sat Aug 26, 2017, 5:00 pm

Ongoing purchasing and waste policy

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  VISHESH AGARWAL  on 

Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.

1
Fri Oct 21, 2016, 10:29 pm

Opt 2 metered water use and building level water metering

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

Can the water meter installed to measure the monthly and total building level water (WEPR2) be used to determine the anual Option 2 metered water use baseline (WEPR1 option2) if there is no more

0

Diverse Uses within a Shopping Center

CS-v4 LTc4:Surrounding density and diverse uses
posted by  Frank Sherman  on 

The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater.

1
Tue Jan 17, 2017, 8:13 pm