Option 2. Additional reductions beyond 30%. VS. Reduce LWR 50%

NC-v4 WEc1:Outdoor water use reduction
posted by  Jing Zhang  on 

Outdoor Water Use Reduction Credit Does option 2 means, if reduction ranges from 50% to 100%, then, at least 30% need to be achieved only through plant and irrigation system efficiency.

1
Thu Oct 19, 2023, 1:36 am

Budget Method

NC-v4 EQc2:Low-emitting materials
posted by  LUCY WILLIAMS  on 

We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.

1
Mon Aug 21, 2017, 1:25 pm

Product Specific & Industry EPD

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Leanne Conrad  on 

Our project may be able to obtain this credit, but it might come down to the last half value for an industry EPD.

1
Wed Jan 11, 2017, 7:09 pm

Rainwater Management

Data-Centers-NC-v4 SSc4:Rainwater management
posted by  Hadar Farjo  on 

Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?

1
Sat Aug 26, 2017, 11:26 am

Ongoing Goods Accounting

EBOM-v4 MRc1:Purchasing - ongoing
posted by  Jordan Sager  on 

In the reference guide, the credit language says "Purchase at least 60%, by cost, of total ongoing consumables that meet at least one of the following criteria...: Postconsumer recycled content: mu

1
Wed Mar 25, 2015, 5:03 pm

Cycle lane between project and Bicycle Network

NC-v4 LTc6:Bicycle facilities
posted by  Alicia Costas Freire  on 

Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be

0

ERV

Homes-v4 EQp1:Ventilation
posted by  Gustavo De las Heras Izquierdo  on 

Has anyone installed an ERV ventilation system? Does it need to be Energy Star certified or this requirement is only for extractors?

1
Sun Aug 6, 2017, 3:14 pm

Matting

EBOM-v4 EQp3:Green cleaning policy
posted by  Louise Taillon  on 

are there are any specifics as to what type or quality of matting that must be installed?

1
Fri Sep 26, 2014, 7:27 pm

PV System on Campus Project

CS-v4 EAc5:Renewable energy production
posted by  Annalise Reichert  on 

I am working on a Campus project that consists of 3 Core and Shell office buildings and 1 parking garage.

1
Tue Jan 24, 2017, 3:16 pm

Minimum Energy Performance Calculator - Receptacle Equipment

NC-v4 EAp2:Minimum energy performance
posted by  Mark Zoeteman  on 

Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p

1
Wed Apr 1, 2015, 11:40 pm