Electric Bike Storage

NC-v4 LTc6:Bicycle facilities
posted by  Irena Skoda  on 

Soon there will be a need to incorporate electric bikes and not just standard bike storage. Somewhat of a bigger space issue.

0

IEQc5 Daylight Measurements

EBOM-v4 EQc5:Daylight and quality views
posted by  Alexa Stone  on 

Does the daylight measurement need to show compliance at both measurements to achieve the credit? We are making improvements that comply on the 2nd measurement. Please advise and thanks.

1
Tue May 30, 2017, 10:27 pm

Tracking Categories

NC-v4 EQc2:Low-emitting materials
posted by  Kerry Honsinger  on 

If we know were are only going to achieve 3 or 5 categories as compliant, is it still necessary to track all 6 categories and report in the xcel form, or do we just track the categories we think we

1
Wed Oct 5, 2016, 2:57 pm

Phased Flush Out

Schools-NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.

1
Mon Aug 28, 2017, 2:09 pm

Supplemental Guidance to the MPR for LEED v4

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  SoYoung Lee  on 

It seems to me that the MPR guidance for LEED v4 does not sufficient to comprehend the project specific features.

1
Wed Mar 16, 2016, 3:22 pm

municipality irrigation line

CS-v4 WEc1:Outdoor water use reduction
posted by  Radwa Amin  on 

the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Does that count as an alternative water sources? Thank you

1
Tue Oct 15, 2019, 7:26 am

Option 1 - ASE and the 10% LEED requirement

CI-v4 EQc7:Daylight
posted by  Alain Brierley  on 

I am working on a large three story office building and analyzing it to see how it would preform under Option 1 requirements.

1
Tue Jan 17, 2017, 7:23 pm

Utility tariff - an accepted DR strategy?

Data-Centers-NC-v4 EAc4:Demand response
posted by  H.K.C.B. Heendeniya  on 

Hi, Our electricity tariff for industries has a time based component and peak demand (kVA) component.

1
Fri Dec 13, 2013, 2:17 pm

Bicycle Facilities credit - required bike lane width

NC-v4 LTc6:Bicycle facilities
posted by  Michelle Bombeck  on 

Does anyone have any insight into the on-street bike lane width requirements for this credit?

1
Thu Jan 9, 2014, 8:31 pm

Transients, visitors and peak visitors

NC-v4 LTc6:Bicycle facilities
posted by  Sara Johansson  on 

The LEED manual states that transients = visitors. The credit requirements are percentages based on peak visitors. Appendix 2 in the manual gives defaults on transients (visitors).

1
Mon Nov 28, 2016, 7:48 pm