NC-v4 LTc6:Bicycle facilitiesposted by Irena Skoda on
Soon there will be a need to incorporate electric bikes and not just standard bike storage. Somewhat of a bigger space issue.
IEQc5 Daylight Measurements
EBOM-v4 EQc5:Daylight and quality viewsposted by Alexa Stone on
Does the daylight measurement need to show compliance at both measurements to achieve the credit? We are making improvements that comply on the 2nd measurement. Please advise and thanks.
Tracking Categories
NC-v4 EQc2:Low-emitting materialsposted by Kerry Honsinger on
If we know were are only going to achieve 3 or 5 categories as compliant, is it still necessary to track all 6 categories and report in the xcel form, or do we just track the categories we think we
Phased Flush Out
Schools-NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.
Supplemental Guidance to the MPR for LEED v4
NC-v4 MPR1:Must be in a permanent location on existing landposted by SoYoung Lee on
It seems to me that the MPR guidance for LEED v4 does not sufficient to comprehend the project specific features.
municipality irrigation line
CS-v4 WEc1:Outdoor water use reductionposted by Radwa Amin on
the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Does that count as an alternative water sources? Thank you
Option 1 - ASE and the 10% LEED requirement
CI-v4 EQc7:Daylightposted by Alain Brierley on
I am working on a large three story office building and analyzing it to see how it would preform under Option 1 requirements.
Utility tariff - an accepted DR strategy?
Data-Centers-NC-v4 EAc4:Demand responseposted by H.K.C.B. Heendeniya on
Hi, Our electricity tariff for industries has a time based component and peak demand (kVA) component.
Bicycle Facilities credit - required bike lane width
NC-v4 LTc6:Bicycle facilitiesposted by Michelle Bombeck on
Does anyone have any insight into the on-street bike lane width requirements for this credit?
Transients, visitors and peak visitors
NC-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
The LEED manual states that transients = visitors. The credit requirements are percentages based on peak visitors. Appendix 2 in the manual gives defaults on transients (visitors).