Forum quick links
Definition of Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Yoyo Shek on
Does the road (for vehicle) is classified as bicycle paths?
Greenguard Gold, SCS Indoor Advantage Gold?
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Do these certifications meet the requirements for furniture?
Criterion valuation factor
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by soha yamani on
what is Criterion valuation factor ? it is mentioned in the calculation part Equation 2 for option 2 of this credit in the reference Guide p.
EPD and MC02
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Guido Mattarello on
Hi all. I'm student working on a thesis about lca, epd and leed. The product under assessment is a unitized façade system. A façade-related EPD will be issued, once the building is complete.
LEED ND Infrastructure energy efficiency
ND-v4 GIBc13:Infrastructure energy efficiencyposted by Lakshmi Suryan on
Hi , I am looking at specific methodologies regarding setting up the baseline energy use for infrastructure for a master plan .
Dist. Center - Light polution
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Antonio Macedo Filho on
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?
Dates of Documentation
CI-v4 MRp2:Construction and demolition waste management planningposted by Kerry Honsinger on
Does LEED track the dates of documentation that is required to be uploaded?
Blind
CI-v4 EQc5:Thermal comfortposted by Ameet AA on
Hi, Can blind be considered as control for thermal comfort? Thanks.
Acoustic Performance Calculator
NC-v4 EQc9:Acoustic performanceposted by Michelle Rosenberger on
I have a fully filled out acoustic performance calculator that is showing "No" compliance on Background noise that I believe is because of 2 empty rows in the table. I have enabled Macros.
Existing building structure to be acquired and then certified.
NC-v4 MPR1:Must be in a permanent location on existing landposted by Guillermo Brunzini on
One of our clients is acquiring a recently finished concrete structure for a new development and wants to know the feasiblity of getting a LEED certification. The original concrete structure to be