Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Structure and Enclosure

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Jon Clifford  on 

A discussion on the BPDO-EPD forum (http://www.leeduser.com/comment/redirect/66396) has started me thinking about how to treat materials that could fall on a Credit tipping point depending on wheth

0

calculating FTE

Schools-NC-v4 WEp2:Indoor water use reduction
posted by  Charli Holt  on 

I am working on a project in Hammond, LA for a university. The building is 2,000 sqft and is a "teaching sustainability center". I am unsure on how to calculate the FTE's for WEp2 etc.

1
Mon Jul 7, 2014, 6:27 pm

Shuttle Service Still Eligible?

CI-v4 LTc3:Access to quality transit
posted by  Brian Salazar  on 

Under v3, if a shuttle service was provided by the employer or landlord within 2 miles of a major transit hub such as light rail, bus terminal, or commuter rail, a project would be awarded these po

1
Mon Dec 5, 2016, 10:42 pm

Acoustic performance

Data-Centers-NC-v4 EQc9:Acoustic performance
posted by  neeraj arora  on 

How to calculate composite STC for a room?

1
Wed Apr 13, 2016, 4:05 pm

LEED NC - v4 MRc3 Wood products

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sandra Closson  on 

The language of NC v4 does not specifically call out new wood. "Wood products must be certified by the Forest Stewardship Council or USGBC-approved equivalent.

1
Fri Jul 31, 2015, 5:14 pm

Less than 100 regular occupants

EBOM-v4 LTc1:Alternative transportation
posted by  Charalampos Giannikopoulos  on 

According to Table 5 (Reference Guide, p. 49) for 100 regular building occupants the sample size needs to be 81.

1
Thu Mar 3, 2016, 10:59 pm

Customer Use of Restrooms

Retail-CI-v4 WEc1:Indoor water use reduction
posted by  Mélanie Pitre  on 

Working on a retail project, we have the same case as described by Donny Goris Kolb in his comment : the store's restrooms are intended for employee use, but employees are directed to grant custome

1
Sat Aug 26, 2017, 4:21 pm

Cycle network, paths?

NC-v4 LTc6:Bicycle facilities
posted by  Karen Elliott  on 

Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!

1
Thu Feb 25, 2016, 11:37 pm

Automatic Receptacle Control for Renovation projects

CI-v4 EAp2:Minimum energy performance
posted by  Jeni Panars  on 

ASHRAE requires at least half of all private offices, open offices, and computer classrooms to be controlled by an automatic control device.

1
Thu Jun 29, 2017, 12:24 am

100% OA Laboratory System

NC-v4 EAp2:Minimum energy performance
posted by  Charles Daze  on 

I have a HVAC system with labs on it requiring 100% outside air systems. Following all the guidance in 90.1 these spaces require a dedicated Sys 5/7 because they are over 5,000 cfm.

1
Thu Oct 6, 2016, 3:05 pm