Renewable Energy Cost Saving for LEEDv4
NC-v4 EAc2:Optimize energy performanceposted by Daniel Ohnuma on
The LEED v4 Guide steps that it's possible only apply any savings from ON-SITE renewable energy systems?
Feedback on test results?
CI-v4 EQc4:Indoor air quality assessmentposted by Joanna Switzer on
Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.
Transportation Planning Handbook
NC-v4 LTc7:Reduced parking footprintposted by Susannah Goddard on
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4.
Natural ventilation openings' control
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
According to ASHRAE 62.1 - 2010 User's Manual, example 6-AF, the requirement associated with controls that guarantee that the openeings remain open during occupancy can be met with an administrativ
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
Question about ASE study area
NC-v4 EQc7:Daylightposted by Jackie Cheung on
Hello everyone. May I ask 2 questions about this credit? A) Assuming a project go for option 1.
The Eco Declaration
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Kristopher Croghan on
Many of our client's printers have received The Eco Declaration, an ECMA-370 Standard. Does this comply with the LEED 4 criteria?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Using different energy rates between CHP Proposed and Baseline
NC-v4 EAp2:Minimum energy performanceposted by Mark Benson on
I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.
Can Building Envelope CxA be the acoustical engineer
NC-v4 EQc9:Acoustic performanceposted by Edgar Arevalo on
I know under LEED that the design engineers cannot also be the Cxa, but does that also apply for an entity/company who is the building envelope CxA but can also be the acoustical engineers?