Forum quick links
occupancy sensor in big offices
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I read in paragraph 9.4.1.2 b. that "an occupant sensor or a timer switch shall be installed (...) in: (...) 6. office spaces up to 76.2m2". Does it mean that for bigger offices (i.e.
Material Streams in New Construction
NC-v4 MRc5:Construction and demolition waste managementposted by Allison Wilson on
My best understanding is that there are five possible material diversion streams: - Commingled recycled - Donated - Recycled – source separated - Reused - Salvaged My question is this: how do you
Number of Trips
EBOM-v4 LTc1:Alternative transportationposted by JOHN COOK on
On the Alternative Transportation Calculator does " number of vehicle trips" imply one way or round trip?
Minimum Energy Performance Calculator v04
CS-v4 EAp2:Minimum energy performanceposted by Martin K on
Hi all, I have a problem with Minimum Energy Performance Calculator for v4. I need to choose the DES path within the General Info tab and I'm not allowed to do any change.
Excellent Modeling Guide
NC-v4 EAp2:Minimum energy performanceposted by Marcus Sheffer on
In case you have not seen this relatively new guide I would highly recommend it to help with your modeling issues. ANSI/ASHRAE/IES Standard 90.1-2010 Performance Rating Method Reference Manual h
Providing private buses
NC-v4 LTc5:Access to quality transitposted by Hanh Truong on
LEED 2009 allowed the use of private shuttle buses in the achievement of SSc4.1: Alternative Transportation if "Shuttle buses should provide direct access to transit facilities within 2 miles of th
Existing Envelop for Baseline case
Schools-NC-v4 EAp2:Minimum energy performanceposted by John on
I am modelling a school building where the new insulation is being added to the existing walls.
62MZ calculator in version 4 LEED
NC-v4 EQp1:Minimum indoor air quality performanceposted by robert feduik on
Has this calculator been changed for use in NC-v4 EQp1 versus the one used in LEED 2009? For new construction, are there any other prerequisites or credits that require the use of this tool in th
Installation of Lighting Posts
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Claire Bannister on
We are having two large solar to LED light poles installed in our parking lot. Would this be included in this Facility Maintenance & Renovation credit, as well as "Purchasing- Lamps"?
Energy Model for Ice Rink
NC-v4 EAp2:Minimum energy performanceposted by Shenhao Li on
Hello, We have a speed skating oval project. Should the energy used for ice rink modeled as process load? We think this will be the major energy consumption.