Forum quick links
Project with no off-street parking spaces
ND-Plan-v4 NPDc5:Reduced parking footprintposted by Noriko Nagazumi on
Hi, Our project has no off-street parking spaces.
Modeling Limitations to the Simulation Program
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Vasileios Kalfountzos on
I am currently working on developing the baseline building for our Energy modelling and I'm stuck on the following point of Table G3.1 point 13. "If the simulation program cannot model a component
Reduced Truck Idling
Warehouses-NC-v4 LTc8:Green vehiclesposted by Michelle Rosenberger on
Okay first up, I'm confused. The Birds Eye Language above is for the regular New Construction options, not for the Warehouses and Distribution options.
Existing Landscape Area
ND-Plan-v4 GIBc4:Outdoor water use reductionposted by Noriko Nagazumi on
Hi, Our project has a portion of existing landscaped area within the project boundary.
Manufacturer Inventory
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Jason Grant on
Hi Paula - If an engineered wood flooring manufacturer wanted to qualify a product line under Option 1, is it safe to assume that they would just need to publish the list of chemical ingredients of
Showers & Changing Facilities
CS-v4 LTc6:Bicycle facilitiesposted by Edna Urias on
We were wondering if a Core & Shell building will be subdivided in a future for 2 tenants, do we have to consider shower facilities at 100 feet from each main entrance ?
Zero Lot Line Property
NC-v4 SSc6:Light pollution reductionposted by Edgar Arevalo on
The building that is going for LEED certification is on a zero lot line property.
Discounted Permits as Preferred Parking?
NC-v4 LTc7:Reduced parking footprintposted by Nathan Gauthier on
Have people tried using discounted parking as preferred parking for this credit?
Hiring CxA for Construction other than one hired during Design
NC-v4 EAc1:Enhanced commissioningposted by mohammad Hassan on
Can a different CxA for a project Construction Phase be hired other than the one hired during Design Phase ?
list of approved programs?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by emily reese moody on
I could have sworn I saw a link somewhere in LEEDUser to a list of approved programs to use for this credit (that also gets updated as USGBC adds more programs), but can't find it now. Did I imagin