Forum quick links
Using v4 requirements on a v3 project
NC-v4 LTc4:Surrounding density and diverse usesposted by Brightworks Sustainability on
Our project is hoping to use the v4 criteria (diverse uses) to meet the requirements for a v3 project.
" no view down into", how to interpret this?
NC-v4 EQc6:Interior lightingposted by Qiang Zhang on
Interior Lighting question. Option 2. Lighting Quality (1 point) A.
Waste Stream Audit
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Trevor Anderson on
Under LEED v4, is the waste audit requirement the same for projects achieving initial certification and recertification, or do recertifying projects need to conduct one waste audit for each year of
correction for online reference guide
NC-v4 SSc4:Rainwater managementposted by Lyle Axelarris on
I have subscribed to access for the online v4 Reference Guide, and I noticed a couple of mistakes in the example for this credit.
basic soil tests at design phase
NC-v4 SSc2:Site development - protect or restore habitatposted by Charline SEYTIER on
Dear All, We are pursuing option 1 in one of our projects and want to submit it for Design Submission as this is a Design Credit. However Documentation requires "basic soils test(s) to demonstrate
How to earn AP with specialty?
Healthcare-v4 INc2:LEED Accredited Professionalposted by Joyce Kelly on
How does one earn LEED AP with specialty? I would like to earn the right to be LEED AP on Healthcare projects in the future. Is there a specialty exam to take? I am just BD+C.
HPD - predicted by process chemistry
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Suzanne Drake on
"Predicted by process chemistry" is indicated on the HPD I am reviewing. Is this acceptable in any way toward the Building Product Disclosure credit?
Option 1 - HPD Residual Disclosure
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Dalton Ho on
Option 1 requirements state that for the HPD to be applicable, the “HPD standards for the 1,000-ppm level must be attained and the appropriate box on the summary page checked”.
Dimension of entryway systems
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by LEED Pro Consultant on
Hi, We are trying to apply this credit in a small office building, so we want to know if the dimension of entryway systems can be modified due to three meters is a very large distance in a building
Cyclist provision for hotels
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I am currently working on the LEED assessment of a hotel.