Forum quick links
62MZ calculator in version 4 LEED
NC-v4 EQp1:Minimum indoor air quality performanceposted by BEE Incorporations on
There is no 62MZ calculator in version 4 LEED here: http://cn.usgbc.org/resources/minimum-indoor-air-quality-performance-calculator Is there a new 62MZ calculator in version 4 LEED?
Separate MEP CxA and BECxA
NC-v4 EAc1:Enhanced commissioningposted by Annalise Reichert on
I am working on a project that is pursuing both Monitoring-based Commissioning and Building Envelope Commissioning.
District cooling system with different construction planning
NC-v4 EAp2:Minimum energy performanceposted by Jeroen Sap on
I have a project at hand with a high LEED ambition. They have the opportunity to connect to a future district cooling system (high efficiency).
Calculating Materials vs. Construction vs. Project costs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jessica McNaughton on
The default materials calculation is 45% of construction costs (Div 3-10 primarily). Is there a generally accepted percentage of project costs that is considered to be construction costs?
FSC Language in LEED V4
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Dori Hauser on
The alternative documentation process for FSC as described in V4 on page 534 is confusing: The issues in particular are: - The woodworker must install the product.
Data Center Baseline systems
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.
Auditorium seating
NC-v4 EQc2:Low-emitting materialsposted by Caroline PIN on
Dear all, Does auditorium seating fall under furniture category ? If yes, had we include it for calculation or it is optional ?
Envelope Commissioning for a Major Renovation
NC-v4 EAc1:Enhanced commissioningposted by Eleni Tsivitzi on
Does anyone have experience doing envelope commissioning for an existing building? The project will be a Major Renovation with fairly extensive HVAC upgrades.
Charrette duration / delivery flexible?
NC-v4 IPc1:Integrative processposted by Vince Briones on
Has anyone had success with (2) 2-hr sessions being accepted as compliant (by GBCI) for the integrated design team charrette?
Part-load efficiency (IEER)
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
According to Table 6.8.1B of ASHRAE 90.1.2010 it is required that the baseline HVAC systems serving spaces have a specific full-load and part-load efficiency.