Option 2 Simulation

NC-v4 EQc7:Daylight
posted by  Charalampos Giannikopoulos  on 

For Option 2 (Simulation) is it accepted to run the simulation for 9.00 and 15.00 on September 21 only, or should it be repeated for March 21st and get the average of both?

2
Tue Dec 2, 2014, 6:58 pm

Meter Declaration Requirements

EBOM-v4 WEp2:Building-level water metering
posted by  LEED Pro Consultant  on 

Are we exempt of providing the meter declaration if the water-meter has been installed by the water company (government)? What would the criteria for this be?

3
Mon Nov 24, 2014, 7:45 pm

MR cr2 : Option2

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Remigio Antonio Rancan  on 

Hi all. I’d like to give the right interpretation about option2.

2
Director of Client Engagement
Natural Capital Partners
LEEDuser Basic Member
42 thumbs up
Sat Nov 22, 2014, 8:47 am

Pilot Credit 88: LEED O+M Starter Kit

NC-v4 INc1:Innovation
posted by  Charalampos Giannikopoulos  on 

In LEED v4 NC, the pilot credit “IPpc88 - LEED O+M Starter Kit” is available to implement for up to 4 points.

2
Sr. Sustainability Project Manager
CodeGreen Solutions
LEEDuser Basic Member
25 thumbs up
Wed Nov 19, 2014, 7:43 pm

LEED Online Form

Healthcare-v4 EQc2:Low emitting materials
posted by  Catherine Blakemore  on 

Is there anyway to download a pdf copy of the LEED Online for this credit? I'm curious to see if it differs form the 2009 LEED for Healthcare IEQc4 form or if the form is the same.

2
Thu Nov 6, 2014, 2:39 pm

GoO equivalency to Green-e Standard

NC-v4 EAc7:Green power and carbon offsets
posted by  Paola Moschini  on 

Dear All, for an Italian project I need to assess the equivalency between Guarantee of Origin issued by a National energy Authority (GSE) and the Green-e standard.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Sun Nov 2, 2014, 11:53 pm

Composite wood products

NC-v4 EQc2:Low-emitting materials
posted by  Caroline PIN  on 

Dear all, Our project in France is considering using panel made of laminated composite wood on some walls.

2
Wed Oct 29, 2014, 5:39 pm

Option 2 : budget calculation method

NC-v4 EQc2:Low-emitting materials
posted by  Caroline PIN  on 

Dear all, Under Option 2 how determine if furnitures are concerned ? Thank you !

2
Wed Oct 29, 2014, 5:15 pm

Doors with composite wood core

NC-v4 EQc2:Low-emitting materials
posted by  Christine Morris  on 

We are a manufacturer that uses composite wood door cores that we clad with a sheet material.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7782 thumbs up
Wed Oct 29, 2014, 1:20 pm

Table 1 is compulsory

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

it is required to comply with the table 1 for each fixture as it seems to state in the establisment period for option 1 calculated water use, or it is enough to comply with the baseline 120% o 150%

2
Sustainability Advisor
Transwestern Sustainability Services
LEEDuser Basic Member
12 thumbs up
Tue Oct 7, 2014, 5:43 pm