Forum quick links
Energy Modeling Procedure for a Data Center
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Santiago Rodriguez on
We are working on a project that is seeking the LEED NC 2009 Certification.
How to interpret the last sentence?
NC-v4 MRc1:Building life-cycle impact reductionposted by Qiang Zhang on
In MR Credit Building Life-Cycle Impact Reduction,for Historic Building definitions, some languages confused me. It embodies the distinctive characteristics of a type, period, or method of constru
Credit compliance outside the U.S.
NC-v4 EQc2:Low-emitting materialsposted by Charalampos Giannikopoulos on
For a project outside the U.S. would products (adhesives, sealants, paints and coating) meeting the European Decopaint Directive (2004/42/EC) qualify for the credit?
Strategies to avoid high illuminance level
NC-v4 EQc7:Daylightposted by SSN Energy Model on
Hello everyone, Greetings for the day We are doing daylighting simulation for the project which will be registered under LEED Version 4. As per the requirements of LEED v4 EQ Cr7, the project shoul
Prerequisite
NC-v4 IPc1:Integrative processposted by Lorne Mlotek on
Just want confirmation that there is no prereq for performing IP.
Credit Language
NC-v4 WEc1:Outdoor water use reductionposted by Adam Noureddine on
Hello, I noticed that the credit language is the same for prerequisite 1 and the credit 1 Option 1. In my opinion, this option becomes redundant and obsolete since the prerequisite is required.
Low Emitting Materials - French Legislation Class A+
Retail-NC-v4 EQc2:Low-emitting materialsposted by Ian McCall on
Hello all LEED V4 ers, LEED / USGBC have now accept International VOC / TVOC standards. LEED accepts the French class A+ formaldehyde limit value of 10 μg/m³ done at 28 days.
Do school buses contribute to the Option 2 rate
Schools-EBOM-v4 LTc1:Alternative transportationposted by R. Ted Krasnesky on
Do school buses contribute as a "ride share" option for students that contribute to the Option 2 alternative transportation rate?
Unoccupied Building
Data-Centers-NC-v4 MPR3:Must comply with project size requirementsposted by Phillip Cook on
I am working on a datacentre that does not include any occupied areas and will have no regular staff on site - security and network support will be provided from an adjoining site.
Trash can liner credit EBOM V4
Retail-EBOM-v4 EQc7:Green cleaning - products and materialsposted by Marion Stecklow on
What is the credit requirement for trash can liners in EBOM v4?