Forum quick links
Typical TSS measures from Sedum roofing
NC-2009 SSc6.2:Stormwater design - quality controlposted by Andreas Soederberg on
We are planning to have Sedum Roofing, partly to recieve credit 6.1. I have read a lot about vegetated roofing also to pursue credit 6.2.
% of annual rainfall treated?
NC-2009 SSc6.2:Stormwater design - quality controlposted by Kash Boodjeh on
The reference guide states that "90% of the avg annual rainfall is equivalent to treating the runoff from 1" of rainfall for a Humid Watershed (at least 40")." I don't understand how they arrived a
Treating stormwater only?
NC-2009 SSc6.2:Stormwater design - quality controlposted by Nicole Kimoto on
Could this credit be achieved if it were only proposed to treat the storm water runoff with a structural measure and not capture?
Approval of BMPs not fully installed
NC-2009 SSc6.2:Stormwater design - quality controlposted by Rob Watson on
We have a client in a far northern climate that wants to achieve additional credit by installing rain gardens to handle runoff during the summer rainy season.
Project with large natural green areas.
NC-2009 SSc6.2:Stormwater design - quality controlposted by Renaud Gay on
I am a little bit confused by this project and would like to have your advise.
Retention Tank
NC-2009 SSc6.2:Stormwater design - quality controlposted by Anna Korinkova on
Dear Leedusers, our project will install a retention tank which will collect storm water from the whole LEED area. The retention tank will provide water for flushing toilets and watering greenery.
Stormwater Management Plan
NC-2009 SSc6.2:Stormwater design - quality controlposted by Nisreen Alhussein on
I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?
use of lead metal downspouts in stormwater systems
NC-2009 SSc6.2:Stormwater design - quality controlposted by Debra a. Lombard on
use of lead metal downspouts in stormwater systems does LEED NC v2009 (v3) prohibit the use of lead based metals?
Achieving credit using TSS concentrations
NC-2009 SSc6.2:Stormwater design - quality controlposted by Manuel Martin Delgado on
Hello, I would like to get confirmation on whether the following approach of demonstrating compliance with LEED requirements could be accepted or not.