Forum quick links
Appealing WEp1
NC-2009 WEp1:Water use reductionposted by Anu Sumanth on
We have a small two story core and shell project. The owner provided rough ins for plumbing fixtures to be installed by the tenant.
Greywater and wastewater reuse
NC-2009 WEp1:Water use reductionposted by CT G on
We have seen several comments regarding the possibility (or not) to achieve both WEp1 and WEc3 through the use of on-site greywater and wastewater.
FTE/calc guidance for hospitality
NC-2009 WEp1:Water use reductionposted by Tristan Roberts on
FYI, the November 2011 addenda has two additional pieces of guidance on WEp1 calcs that are especially useful for hospitality:
Vairable flow showers
NC-2009 WEp1:Water use reductionposted by Nicholas Bristow on
We are considering using multi-flow shower heads on a commercial office project for the locker rooms.
Sauna
NC-2009 WEp1:Water use reductionposted by Jim Park on
I am working on a hotel project, which would use standard fixtures (no high-efficiency fixtures), but would still earn 2 points under WEc2, and 2 points under WEc3 due to utilizing recycled gray wa
FTE for campus or for building
NC-2009 WEp1:Water use reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
tested flush and flow rates
NC-2009 WEp1:Water use reductionposted by Erin Holdenried on
I have a major renovation project that has existing plumbing fixtures that will remain.
Three Different Kitchen Sinks
NC-2009 WEp1:Water use reductionposted by Eric Webber on
If our project has three different kitchen sinks with varying flow rates (ie SK-1: 1.0GPM, SK-2: 1.5GPM etc), how do I enter the usage for the FTE in the project?
Pressure of Showers in a residential building
NC-2009 WEp1:Water use reductionposted by María Fernanda Aguirre on
Hi! We have a data sheet from a shower which specifies a flow of 7,8 liters/minute at a pressure of 5.5 kgf/cm2 (which is equivalent to 5,39 Bar or 78 PSI).