Forum quick links
Feedback on 0.5 gpm faucets and recirculation loops
NC-2009 WEp1:Water use reductionposted by Susan Walter on
We're proposing 0.5 gpm faucts for a project and the client is demanding more information from other facilities on these faucets.
Existing and new fixtures
NC-2009 WEp1:Water use reductionposted by Saju Varghese on
I have a facility that will be LEED NCv2009 certified and is part existing and partly new.
Urinals are not everywhere
NC-2009 WEp1:Water use reductionposted by Tatjana Ernst on
Hi Everyone, we have a building which has 37 dual flush for men and 8 Urinals, the Urinals are not in every toilet room (for example there are no urinals in the basement), there will be only one
Master's Research Survey
NC-2009 WEp1:Water use reductionposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
How to document a pre-rinse spray valve in the form online????
NC-2009 WEp1:Water use reductionposted by Robert Robison on
Review comments have requested that I include the pre-rinse spray valve in the hotel kitchen in my water usage calculations.
Vandal-resistant aerator
NC-2009 WEp1:Water use reductionposted by Marc Mondor on
Hello, We just got our review back for a new construction of an office building. For this credit we had a comment from the reviewer, that we have never encounter before.
Fountains
NC-2009 WEp1:Water use reductionposted by Mike D on
Should decorative fountains be documented under any water-related credits such as this one or the water-efficient landscaping credit?
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water use reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
Multi-Flow Showerhead
NC-2009 WEp1:Water use reductionposted by Annalise Reichert on
I am working on a project that plans to install a shower head with three flow options: 0.5 GPM-1.0 GPM -1.5 GPM. How do we account for multi-flow showerheads on the WEp1 form?
Use of "Offsite" sources of nonpotable water
NC-2009 WEp1:Water use reductionposted by Ahmed Mosa on
i understand the focus of the credit is water efficiency of the installed fixtures but can "Offsite" sources of nonpotable water such as captured rainwater, graywater, air conditioner condensate, c