Post a question or comment
Credit Filters
Minimum energy performance
Filter by location
Forum
Topic
Replies
Recent

purchased heat pumps for ASHRAE 90.1

NC-2009 EAp2:Minimum energy performance
posted by  Jean Marais  on 

Dear Group, As you know additional requirements from LEED led to purchased heat water coils being substituted for furnis heat coils in some unitary systems.

1
Tue Jun 4, 2013, 1:34 pm

Ground source water loop required District Cooling guidance?

NC-2009 EAp2:Minimum energy performance
posted by  Saju Varghese  on 

We would like to ask something regarding a comment from a reviewer for EAc1, this is a rather vague comment in our view.

1
Tue Jan 7, 2014, 9:14 pm

Modeling Multiple Buildings

NC-2009 EAp2:Minimum energy performance
posted by  Santiago Rodriguez  on 

I am working on a new project which consists in 5 buildings, all have its own HVAC system designed, 3 of them have a complete HVAC, and the other 2 will only have Mechanical Ventilation to cool the

1
Thu Dec 1, 2011, 7:30 pm

Baseline Case Selection

NC-2009 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Dear All:- Our project consist of 4 floors but Air conditioning area is less than 25000 so it is confuse us to select base case system so please help us in selecting base case system Heating sour

1
Mon Apr 10, 2017, 1:41 pm

Natural Ventilation on HAP

NC-2009 EAp2:Minimum energy performance
posted by  Khaled Fouda  on 

Hey All, This question is basically for the energy modelers out there who use HAP or any other software. I have a conditioned lobby where the fan coil just uses the return air, according to our ca

1
Mon Aug 31, 2015, 3:46 pm

IES ApacheHVAC - Proposed system for VRF

NC-2009 EAp2:Minimum energy performance
posted by  Alice chen  on 

Hi All, I am modelling a VRF system using ApacheHVAC in IES. But have no idea which prototype to choose.

0

System Type 9 Baseline Fan Sizing

NC-2009 EAp2:Minimum energy performance
posted by  Brian Kenney  on 

I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.

1
Fri Jun 2, 2017, 1:48 pm

Coast Guard Materials Building

NC-2009 EAp2:Minimum energy performance
posted by  Jeff Pilarca  on 

We are starting 8000 sqft Coast Guard Materials Building that has 1300 sqft air conditioned office area. Rest of the building is exhausted. How would you energy model this building?

1
Tue Jul 23, 2013, 1:12 pm

EAp2 Labeling Mechanical Equipment

NC-2009 EAp2:Minimum energy performance
posted by  Ian McCall  on 

Hello, Fact or Fiction: For EAp2 ASHRAE 90.1 §6.4.1.5.1 all mechanical Equipment must have a Label installed by the manufacturer stating that the equipment complies with the requirements of Standa

1
Fri Mar 7, 2014, 6:08 pm
1
Wed Dec 17, 2014, 3:15 pm