thermal blocks & HVAC zones
NC-2009 EAp2:Minimum energy performanceposted by VICTOR MORENO on
Hello, I´ve a question about thermal zonification in my energetic model. I use Energy+ and my proposed HVAC system is Geothermal Heat Pump, AHUs for ventilation requeriments, Fan-Coils and Radian
Process Loads in LEEDOnline Form
NC-2009 EAp2:Minimum energy performanceposted by Omar Elrawy on
Dear all, I need to know if anyone did experience that before.
Air Economizer Requirement
NC-2009 EAp2:Minimum energy performanceposted by Rock Ridolfi on
The owner would like to eliminate economizers on a few of the air handlers.
Appeals
NC-2009 EAp2:Minimum energy performanceposted by J Morrison on
I have been told by our very reputable Design firm that is is not unusual to have two design appeals on the EA credit 1 and prerequisites.
EAp2 - Playground Field, Internal and External Lighting
NC-2009 EAp2:Minimum energy performanceposted by Marcio Alberto Casado Pereira on
Hi, On a Arena Sports stadium we are considering the "Building method Area" for the Interior Lighting.
How to model slab-on-grade floor in simulation program
NC-2009 EAp2:Minimum energy performanceposted by lin wang on
As ASHREA90.1-2007 shown,the slab-on-grade floor of baseline building shoud be modeled by the parameter of F-factor.But the parameter to model slab-on-grade floor in program eQuest is U-value or pr
Baseline existing building envelopes
NC-2009 EAp2:Minimum energy performanceposted by Michela Tedeschi on
Hi, We are currently working on an existing building under major renovation, pursing a LEED certification following NC protocol v.2009.
Energy modeling of a passive building - baseline case vs propose
NC-2009 EAp2:Minimum energy performanceposted by CONSTANZA CATTAN on
Dear all, I'm working on a passive building in which it was decided, as energy efficiency technique, to be buried.
FIre station modeling
NC-2009 EAp2:Minimum energy performanceposted by David Hahn on
I am currently working on a fire station building in NC and I'm using HAP 4.8 to model this building vs. the baseline.