Post a question or comment
Credit Filters
Minimum energy performance
Filter by location
Forum
Topic
Replies
Recent

LEED NC 2009 for factory building

NC-2009 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

The project is a manufacturing facility. The main production block has other adjacent buildings such as admin, canteen, health center, utility and security blocks.

0

Simple simulation question

NC-2009 EAp2:Minimum energy performance
posted by  Timo Marquez  on 

This might be a rather simple question, but would like avoid confusion.

1
Mon Sep 19, 2011, 4:35 pm

Energy Recovery in baseline

NC-2009 EAp2:Minimum energy performance
posted by  Haojie Wang  on 

G3.1.2.10 says ER is needed when design cfm >5000 and more than 70% OA. I wonder does this mean the proposed or baseline design cfm? Our proposed design uses chilled-beam w/100% OA in the DOAS.

1
Fri Mar 25, 2016, 2:52 pm

Mandatory Provisions

NC-2009 EAp2:Minimum energy performance
posted by  Diego Escalona  on 

Hello All, I have two questions about compliance with the mandatory provision: 1) Only the main air conditioning system should be evaluated with the tables in chapter 6?

1
Fri Aug 17, 2012, 8:25 pm

Basecase Building Envelope

NC-2009 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Our project is G+3 factory building and it is a major renovation and we are renovated wall, window, HVAC equipment and we consider ASHRAE 90.1.2007 Building envelope for base case & renovated

1
Thu Dec 22, 2016, 3:57 pm

Laboratories - Appendix G Baseline System

NC-2009 EAp2:Minimum energy performance
posted by  Adam Judge  on 

G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur

1
Wed May 4, 2016, 3:27 pm

n/a

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

G3.1.2.5 states: Ventilation.

1
Fri Jun 3, 2016, 2:49 pm

Baseline system for hybrid service hot water system

NC-2009 EAp2:Minimum energy performance
posted by  Vernon Smith  on 

Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t

1
Fri Apr 7, 2017, 1:26 pm

Instantenous electric water heaters

NC-2009 EAp2:Minimum energy performance
posted by  Adam Rustige  on 

Hello, The model I'm working on has instant electric water heaters, per 90.1 7.4.2 Equipment Efficiency, "Equipment not listed in Table 7.8 has no minimum performance requirements." Electr

1
Fri Jun 28, 2013, 2:17 pm

Does all of Section 1.6 results have to be filled?

NC-2009 EAp2:Minimum energy performance
posted by  Ivan Priatman  on 

Dear LEED, We are trying to achieve points in EAp2 scorecard via Building Simulation Method.

1
Thu Nov 20, 2014, 3:05 pm