Baseline HVAC system exceptions

NC-2009 EAp2:Minimum energy performance
posted by  Ritwik Kakati  on 

I modeled a 10-story hotel building. Since the majority of space are hotel rooms, which are considered to be Residential spaces, the primary Baseline HVAC system type is System #1.

1
Wed Aug 20, 2014, 9:29 pm

Existing Exterior Lighting System

NC-2009 EAp2:Minimum energy performance
posted by  Sundararaj Subburaman  on 

We are doing LEED certification for a building in a campus which already has exterior lighting installed.

1
Mon Sep 19, 2011, 5:29 pm

Process energy

NC-2009 EAp2:Minimum energy performance
posted by  Ricardo Sá  on 

For the purpose of energy modelling of an industrial building, there are rooms which have process related humidity control (humidity control which is not intended for comfort).

1
Mon Sep 24, 2012, 2:22 pm

LEED V4 Section 1.4 Tables

NC-2009 EAp2:Minimum energy performance
posted by  Chilufya Lombe  on 

Hi, not sure if I am missing something but the USGBC website's 'Resources' section does not have an updated section 1.4 table for LEED v4.

1
Mon Sep 29, 2014, 10:26 am

Energy model OA report

NC-2009 EAp2:Minimum energy performance
posted by  Jatuwat Varodompun  on 

If a zone has a large exhaust fan which the exhaust rate is greater than the OA intake at the AHU (the rest of OA will be transferred from other zones , make up air, or infiltration).

1
Wed May 18, 2016, 1:58 pm

Baseline ODA requirement for +30% Vent

NC-2009 EAp2:Minimum energy performance
posted by  Jean Marais  on 

This question came up and I want to refresh my memory. The baseline model must ALWAYS (baring DV) have the same ODA as the Proposed Design...also when the Proposed Design is applying for the increa

1
Thu Oct 11, 2012, 3:37 pm

Baseline Pumping Power

NC-2009 EAp2:Minimum energy performance
posted by  Ahmed Labeeb  on 

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.

1
Thu Feb 9, 2017, 1:03 pm

DES Baseline

NC-2009 EAp2:Minimum energy performance
posted by  SUNG SU KIM  on 

For HVAC System, Our project team will apply to 2 absorption chillers and geo-exchange heat pump.(project site is located in DES) In this case, we know that the baseline system of HVAC is absorpti

1
Fri Dec 9, 2011, 4:09 pm

LEED Energy Model Review

NC-2009 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

Hello Marcus, As an energy modeling expert who has experience reviewing energy models submitted for LEED, how much time is spent by the LEED reviewer on EAp2? I understand there are quite a bit o

1
Thu Jun 9, 2016, 2:14 pm

UnmetLoadHours - Do we have clarity yet?

NC-2009 EAp2:Minimum energy performance
posted by  Jean Marais  on 

The definition of Unmet Load Hours has been vague for quite some time. ASHRAE 90.1 2010 was supposed to address this issue. Do we have some resolution about this yet?

1
Fri Nov 9, 2012, 8:17 pm