Forum quick links
LEED boundary Lighting (exisiting and new)
NC-2009 EAp2:Minimum energy performanceposted by Matt Humphreys on
I have two questions regarding exterior lighting and treatment of the LEED boundary in EAp2. 1.
Radiant tube
NC-2009 EAp2:Minimum energy performanceposted by LEEDme Lorenzi on
A radiant tube gas can be associated with the table 6.8.1E ASHRAE 2007?
Service hot-water system
NC-2009 EAp2:Minimum energy performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the service hot water system for the baseline building.
Major Renovation vs. New Construction
NC-2009 EAp2:Minimum energy performanceposted by MT A on
We are working on a library project that involves the renovation of an existing facility, and the addition of a new wing.
Pressure Drop Adjustment
NC-2009 EAp2:Minimum energy performanceposted by Marina Andrade on
How do I set which the fan power limitation adjutment pressure drop I use at baseline? The standard display multiple values for MERV filters, exhaust and others. What should I use at baseline?
Energy Modeling using "HAP"
NC-2009 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hi Marcus Sheffer, i am totally confused please guide me.
Energy Modeling for DMV Inspection Station
NC-2009 EAp2:Minimum energy performanceposted by Maria Fiorelli on
We have a project in question that is DMV office and vehicle inspection station. The vehicle inspection lanes side of the building are approximately 50% of the total project square footage.
LEED boundary and Major Additions
NC-2009 EAp2:Minimum energy performanceposted by Len Sciarra on
A new project, under LEED-NC, is a major addition to an existing building, in this case a manufacturing facility which will result in basically three sections New Office, Existing Office, and Exist
LEED v2009 Minimum Energy Performance Calculator
NC-2009 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:- 1.Is the LEED v2009 Minimum Energy Performance Calculator sheet is mandatory for LEED 2009 project submission 2.what is the difference between Revised Section 1 4 Tables (Jan 201
DCV modeling
NC-2009 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, The project I'm modeling has several DOA AHUs. Every AHU has a single CO2 sensor located on the return duct next to the unit.