Energy Recovery in baseline
NC-2009 EAp2:Minimum energy performanceposted by Haojie Wang on
G3.1.2.10 says ER is needed when design cfm >5000 and more than 70% OA. I wonder does this mean the proposed or baseline design cfm? Our proposed design uses chilled-beam w/100% OA in the DOAS.
Mandatory Provisions
NC-2009 EAp2:Minimum energy performanceposted by Diego Escalona on
Hello All, I have two questions about compliance with the mandatory provision: 1) Only the main air conditioning system should be evaluated with the tables in chapter 6?
Basecase Building Envelope
NC-2009 EAp2:Minimum energy performanceposted by SAMY Chamy on
Our project is G+3 factory building and it is a major renovation and we are renovated wall, window, HVAC equipment and we consider ASHRAE 90.1.2007 Building envelope for base case & renovated
Minimum Energy performance Calculator
NC-2009 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, We have a project, which is registered upon LEED-NC v2009, with unit type SI. The online form of EAp2 has a new form, which is directing us to upload the Minimum Energy Performance Calcu
Exterior Lighting for Baseline
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
We refer to ASHRAE 90.1 Supplementary Addendum i which discuss the LPD of tradable surface on table 9.4.5.
Fenestratin SHGC for EAp2 baseline and proposed building
NC-2009 EAp2:Minimum energy performanceposted by James Lee on
Thanks for the prompt and kind answer, Marcus. One more thing: Is it possible that baseline SHGC can be smaller than proposed one, even if both are below 0.25 (maximum)? Thanks
n/a
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
G3.1.2.5 states: Ventilation.
Baseline system for hybrid service hot water system
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t
Instantenous electric water heaters
NC-2009 EAp2:Minimum energy performanceposted by Adam Rustige on
Hello, The model I'm working on has instant electric water heaters, per 90.1 7.4.2 Equipment Efficiency, "Equipment not listed in Table 7.8 has no minimum performance requirements." Electr
Does all of Section 1.6 results have to be filled?
NC-2009 EAp2:Minimum energy performanceposted by Ivan Priatman on
Dear LEED, We are trying to achieve points in EAp2 scorecard via Building Simulation Method.