Forum quick links
Appendix A envelope U-values in retrofit projects
NC-2009 EAp2:Minimum energy performanceposted by Saju Varghese on
We are doing a project which is being 10% retrofitted. The reviewer wants us to used the envelope values before retrofitting as baseline and the new envelope properties as the proposed project.
Baseline Exhaust Fans vs. Proposed ERV
NC-2009 EAp2:Minimum energy performanceposted by Candice Rogers on
I am modeling a building that directs all building exhaust through an energy recovery ventilator, including bathroom exhaust.
IES ApacheHVAC - Proposed system for VRF
NC-2009 EAp2:Minimum energy performanceposted by Alice chen on
Hi All, I am modelling a VRF system using ApacheHVAC in IES. But have no idea which prototype to choose.
Same certification process with separated HVAC systems
NC-2009 EAp2:Minimum energy performanceposted by Luana Bertoletti on
Hi, I have a doubt on how to model the baseline HVAC system of a specific project, which consists of a 4-floor base building from which rise two tower with independent HVAC systems.
Daylighting in ECB Method
NC-2009 EAp2:Minimum energy performanceposted by Mark Benson on
I know that I can take credit for automatic daylighting controls under the Performance Rating Method of Appendix G.
CS 2009 EAp2-c1 ACP spreadsheet
NC-2009 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, In the project I'm modeling (C&S), I took the opportunity to use the CS 2009 EAp2-c1 ACP spreadsheet with integrated calculator. I've come to reach 46% of Energy cost influenced by C
Public Comments Until 11/13
NC-2009 EAp2:Minimum energy performanceposted by Glen Phillips on
USGBC released proposed updates to EAp2/EAc1 for LEED 2009, which at its most basic, requires a minimum 4 points under EAc1.
LPD for space types not listed on ASHRAE Table
NC-2009 EAp2:Minimum energy performanceposted by Xun Jia on
Does anyone know how the baseline Lighting Power Density should be set up if the space type is not listed on Table 9.6.1 of ASHRAE 90.1 using Space-by-space method?
Future
NC-2009 EAp2:Minimum energy performanceposted by Graham Langton on
How should a future process be taken into account?
n/a
NC-2009 EAp2:Minimum energy performanceposted by Sivarajah Ragulakeethan on
Hi, Currently I'am working on a LEED Core & Shell mixed development project, and I have an issue on develop model regarding HVAC design.