Denial of EA PR2

NC-2009 EAp2:Minimum energy performance
posted by  Roxanne Button  on 

A client has asked for my advice in appealing the denial of PR2. I've taken a quick look at the review comments but will be digging deeper into it in the next couple of days.

1
Fri Mar 25, 2016, 2:35 pm

Basecase Building Envelope

NC-2009 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Dear All:- we have two major renovated Building in India Building 01. No change in building envelope (used the existing wall, floor, window) but changes in whole MEP Design Building 02.

1
Thu Dec 22, 2016, 3:47 pm

Major Renovation Requirements

NC-2009 EAp2:Minimum energy performance
posted by  Saju Varghese  on 

When a project would be classified under Major Renovation (our project is around 80% renovated) for the energy model, does the baseline have to be the same as Ashrae 90.1 envelope requirements or c

1
Wed Apr 24, 2013, 9:10 pm

HVAC System Type for Cold Storage Room

NC-2009 EAp2:Minimum energy performance
posted by  Santiago Rodriguez  on 

Dear Forum, I have the following issue: For the Certification of a Restaurant, there is an inside area that corresponds to cold storage rooms.

1
Wed Sep 12, 2012, 1:43 pm

Future Process Loads

NC-2009 EAp2:Minimum energy performance
posted by  Victoria Watson  on 

Hi, I am working on a hangar project.

1
Wed Jan 4, 2017, 4:58 pm

LEED boundary Lighting (exisiting and new)

NC-2009 EAp2:Minimum energy performance
posted by  Matt Humphreys  on 

I have two questions regarding exterior lighting and treatment of the LEED boundary in EAp2. 1.

1
Mon Nov 25, 2013, 5:08 pm

Radiant tube

NC-2009 EAp2:Minimum energy performance
posted by  LEEDme Lorenzi  on 

A radiant tube gas can be associated with the table 6.8.1E ASHRAE 2007?

1
Wed Sep 17, 2014, 1:51 pm

Service hot-water system

NC-2009 EAp2:Minimum energy performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt related to the service hot water system for the baseline building.

1
Thu Oct 4, 2012, 3:51 pm

Major Renovation vs. New Construction

NC-2009 EAp2:Minimum energy performance
posted by  MT A  on 

We are working on a library project that involves the renovation of an existing facility, and the addition of a new wing.

1
Wed May 29, 2013, 1:56 pm

Pressure Drop Adjustment

NC-2009 EAp2:Minimum energy performance
posted by  Marina Andrade  on 

How do I set which the fan power limitation adjutment pressure drop I use at baseline? The standard display multiple values for MERV filters, exhaust and others. What should I use at baseline?

1
Wed Oct 22, 2014, 3:13 pm