Post a question or comment
Credit Filters
Minimum energy performance
Filter by location
Forum
Topic
Replies
Recent

Water cooled chillers for very dry areas

NC-2009 EAp2:Minimum energy performance
posted by  Santiago Rodriguez  on 

Dear forum, We have a very critical problem for a LEED C&S 2009 project located in the north of Mexico. The project will be a 13th story office building.

1
Wed Feb 26, 2014, 6:42 pm

Mandatory requirements

NC-2009 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.

1
Fri Sep 25, 2015, 2:56 pm

Dining facility overall area with or without walk-in coolers

NC-2009 EAp2:Minimum energy performance
posted by  Addisu Lemlem  on 

To generate baseline for HVAC systems, the building total SF is 28000 including walk-in coolers and an outside mechanical room. My question is, Can I model the walk-in cooler separate?

1
Thu Jul 7, 2016, 1:41 pm

Rennovation with small addition

NC-2009 EAp2:Minimum energy performance
posted by  Stephanei Mezynski  on 

I am working on a project that is 15,00 sqft renovation and 8,000 sqft new construction (addition).

1
Tue Jul 19, 2016, 3:13 pm

Baseline System Selection - larger heated space - smaller cooled

NC-2009 EAp2:Minimum energy performance
posted by  Don Carsto  on 

Our case involves 16,000 sqft of cooled and heated space and 90,000 sqft of heated-only space. The two spaces happen to be separated by a 4-hour fire wall.

1
Tue Dec 11, 2012, 2:46 pm

Cinemas and Family Entertainment Shops in a Mall

NC-2009 EAp2:Minimum energy performance
posted by  Maya Karkour  on 

Dear All, I have a couple of questions regarding the space types listed in ASHRAE 90.1 Table 9.6.1 (Space-by-Space Method): 1) For underground car parking, the closest space type is the "Parking

1
Mon Apr 14, 2014, 6:10 pm
1
Wed Dec 8, 2010, 4:01 pm

Insulation of Piping Cast into Concrete

NC-2009 EAp2:Minimum energy performance
posted by  André Harms  on 

We are working on a project where a significant amount of the domestic hot water ring feed piping will be cast into the concrete walls, and the designer is querying if these pipes will need to be i

1
Fri Nov 6, 2015, 2:46 pm

Demand Charge & 25% Procsee Cost

NC-2009 EAp2:Minimum energy performance
posted by  Joey Jiao  on 

Hi, everyone, If there is a project with demand charge, how should we deal with the rule of 25% process cost. Assume one building annual cost like below: total demand cost(by $/kw)=1$ total energy

1
Tue Apr 17, 2012, 1:16 pm

Determining Baseline for Mixed Use

NC-2009 EAp2:Minimum energy performance
posted by  Jason Biondi  on 

Hi all, thanks for the forum. The building is 8 stories, 3 flrs office, 3 floors parking, 1 retail, 1 resturaunt. Is it accepabable to use the 5 story building baseline schedule if the parking gara

1
Tue Jan 15, 2013, 10:46 pm