Forum quick links
Heat gain originating from hooded equipment in energy modeling
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
I am doing energy simulations for a factory.
Solar Tubes in Energy Pro
NC-2009 EAp2:Minimum energy performanceposted by Logan Dorrell on
How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat.
Mandatory Provitions - Fenestration and Doors
NC-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi, I have an air conditioned warehouse, where wine will be sotored, and it has two doors, with now vestibules.
Rennovation with small addition
NC-2009 EAp2:Minimum energy performanceposted by Stephanei Mezynski on
I am working on a project that is 15,00 sqft renovation and 8,000 sqft new construction (addition).
Baseline System Selection - larger heated space - smaller cooled
NC-2009 EAp2:Minimum energy performanceposted by Don Carsto on
Our case involves 16,000 sqft of cooled and heated space and 90,000 sqft of heated-only space. The two spaces happen to be separated by a 4-hour fire wall.
Cinemas and Family Entertainment Shops in a Mall
NC-2009 EAp2:Minimum energy performanceposted by Maya Karkour on
Dear All, I have a couple of questions regarding the space types listed in ASHRAE 90.1 Table 9.6.1 (Space-by-Space Method): 1) For underground car parking, the closest space type is the "Parking
Insulation of Piping Cast into Concrete
NC-2009 EAp2:Minimum energy performanceposted by André Harms on
We are working on a project where a significant amount of the domestic hot water ring feed piping will be cast into the concrete walls, and the designer is querying if these pipes will need to be i
Demand Charge & 25% Procsee Cost
NC-2009 EAp2:Minimum energy performanceposted by Joey Jiao on
Hi, everyone, If there is a project with demand charge, how should we deal with the rule of 25% process cost. Assume one building annual cost like below: total demand cost(by $/kw)=1$ total energy
Determining Baseline for Mixed Use
NC-2009 EAp2:Minimum energy performanceposted by Jason Biondi on
Hi all, thanks for the forum. The building is 8 stories, 3 flrs office, 3 floors parking, 1 retail, 1 resturaunt. Is it accepabable to use the 5 story building baseline schedule if the parking gara