Post a question or comment
Credit Filters
Minimum energy performance
Filter by location
Forum
Topic
Replies
Recent
1
Mon Jul 13, 2015, 6:34 pm

CONFUSED IN EAP2 STRATEGY FOR A MASTER SITE PROJECT

NC-2009 EAp2:Minimum energy performance
posted by  VEL MUTHU  on 

Hello everyone, I am currently working on a project which consist of 8 buildings(3 main buildings and 5 supportive building, all are between 8000 to 60,000 sq ft), we are targeting certification le

1
Thu May 26, 2016, 3:16 pm

Baseline system selection

NC-2009 EAp2:Minimum energy performance
posted by  MKK LEED  on 

I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.

1
Tue Feb 14, 2017, 12:10 am

Diversity factor of Server machine

NC-2009 EAp2:Minimum energy performance
posted by  Sivarajah Ragulakeethan  on 

Hi, We are working on a LEED New Construction for Data Center project. I would like to confirm on my understanding. How much can we use as diversity factor for server machine?

1
Wed Mar 22, 2017, 1:34 pm

ASHRAE Advanced Energy Design Guide - Mixed office/warehouse bld

NC-2009 EAp2:Minimum energy performance
posted by  Michael Smithing  on 

We're looking at a building that will have approximately 10,000 sqft. of office space and 10,000 sqft. of warehouse space.

1
Mon Jun 24, 2013, 2:22 pm

90.1-2007 Table G3.1.1A for Additions and Alterations

NC-2009 EAp2:Minimum energy performance
posted by  Evelyn Dicks, EI, CxA  on 

Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations?

1
Tue Jan 31, 2012, 10:30 pm

Appendix G-Baseline HVAC System

NC-2009 EAp2:Minimum energy performance
posted by  Kristin Heinz  on 

Our project is a bed-and-breakfast with guest rooms that are conditioned using PTHP units. A VRF system conditions the common areas with a DOAS that uses a chiller and hot water boiler.

1
Tue Nov 20, 2012, 12:24 am

Baseline HVAC Selection

NC-2009 EAp2:Minimum energy performance
posted by  April Rice  on 

We have a 5 story non-residential building (located on a campus), with a mechanical penthouse (with roof) above.

1
Thu Mar 1, 2012, 12:58 pm

Baseline System 9 fan details

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, We have zones in our project which are addressed to system 9 (heating only).

1
Tue Jul 5, 2016, 1:48 pm

Part Residence and Part Office

NC-2009 EAp2:Minimum energy performance
posted by  April Ambrose  on 

I have a small facility (20k sqft or so) that is approximately 45% office and 55% "transitional" residential. I've modeled it as a residential with PTAC w/ HW Coil per zone, but I'm running into a

1
Thu Dec 6, 2012, 7:26 am