EAC1 - Day Lighting & Other Lighitng controls input
NC-2009 EAc1:Optimize energy performanceposted by susan eguia on
Hi, We've only done the mechanical portion for this project but the client assigned to us the EAc1 credits.
(Jacob) Interior Courtyard Glazing + Energy Model
NC-2009 EAc1:Optimize energy performanceposted by Brett Beckemeyer on
I have a design using a full building energy model in order to achieve as many credits as possible under EAc1.
Question About UPS and Power Supply Efficiency
NC-2009 EAc1:Optimize energy performanceposted by Ricardo Marques on
HI! I would like to take a question about data center's based on Ashrae 90.1 2007 for Leed 2009. In Appendix G "Performance Rating Method", in Baseline Building Performance, I have to attribute a
Energy simulation software
NC-2009 EAc1:Optimize energy performanceposted by Jakub Wiesner on
Hello, I have some experiences with energy modelling in eQuest, but I would like to change my software to something else.
Existing Envelope for LEED v3
NC-2009 EAc1:Optimize energy performanceposted by Ken Pilcher on
Any help regarding the reuse of an existing building LEED simulation would be helpful. We are working on an existing building that was a warehouse and is now an office building.
Interstitial or Interior Blinds
NC-2009 EAc1:Optimize energy performanceposted by Sandra Lester on
Would interstitial or interior blinds could contribute to load reductions and contribute to an increase in energy efficiency?
Manufacturing facility: heat recovery and cooling of compressors
NC-2009 EAc1:Optimize energy performanceposted by Johannes Gellrich on
Dear all, I have a large manufacturing facility with an associated office wing, on which I would like to discuss two things: 1.
Fan Power Approach Not Commented on by LEED Reviewer
NC-2009 EAc1:Optimize energy performanceposted by Charles Shinneman on
I just got some comments back from a LEED submission. The reviewer notes that my input summary does not match the plans.