Forum quick links
Cost of Renewable Energy
NC-2009 EAc1:Optimize energy performanceposted by Gregg Achtenhagen on
I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.
Air Filter "Dirty Filter" Allowance in Fan Energy Calcs
NC-2009 EAc1:Optimize energy performanceposted by Charles Shinneman on
I cannot find where there is any mention about "air filter loading" allowance requirements for fan power calculations.
Landscape lighting
NC-2009 EAc1:Optimize energy performanceposted by Julien Daclin on
Appendix G (Table 3.1) states that lighting power for building facades has to be modeled in the energy simulation.
List of approved LEED modeling Software
NC-2009 EAc1:Optimize energy performanceposted by Lawrence Lile on
I find a listing of approved software for LEED energy modeling here http://energy-models.com/blog/list-approved-leed-simulation-software-packages and in the EAp1 leedonline form.
SS - EM
NC-2009 EAc1:Optimize energy performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.
LPD for space with higher headroom
NC-2009 EAc1:Optimize energy performanceposted by William Wong on
Does anyone know what headroom height are based on when ASHRAE design the LPD for space-by-space method (Table 9.6.1) ?
Solar Panels outside LEED project boundary
NC-2009 EAc1:Optimize energy performanceposted by Kalyan Nishtala on
Hi, I am currently working on a LEED project which will pursue renewable energy credit and also count the savings towards EAc1 points.
What to do when electricity produces less carbon than gas?
NC-2009 EAc1:Optimize energy performanceposted by Raphael Sperry on
Hello all, I'm working on a project for an owner who operates their own hydropower dam. It's an older facility and it the electricity it produces registers as basically carbon neutral.
Constructions surrounding new data center in existing building
NC-2009 EAc1:Optimize energy performanceposted by Ross Farris on
I am working on a project that consists of an existing building which will be retrofitted and modeled as a major renovation under LEED BD+C.
Mixed building
NC-2009 EAc1:Optimize energy performanceposted by Khaled Fouda on
Utility rates is a confusing thing for me, I am working on a building that has 9% Retail Area, 7% Church and the rest is a Residential Area.