Forum quick links
Kitchen Hoods with gas make-up air unit
NC-2009 EAc1:Optimize energy performanceposted by James Sullivan Jr. on
I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process?
South America weather data
NC-2009 EAc1:Optimize energy performanceposted by Carlos Alberto Hoyos Soto on
Anyone knows what energy modeling software has developed South America weather data?
Modeling multiple buildings for Master Site
NC-2009 EAc1:Optimize energy performanceposted by Erika Duran on
We are pursuing Master Site certification on several buildings that are served by the same plant.
CHP Modeling
NC-2009 EAc1:Optimize energy performanceposted by SAMY Chamy on
Dear Marcus..... Greetings... In one of our project , we have CHP which fall under Case 1 as given in LEED Guide, CHP under Same Ownership..We have 2 nos of 500 KW Gas Generator which supplies
ASHRAE compliance with naturally ventilated building
NC-2009 EAc1:Optimize energy performanceposted by Jean Marais on
As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally ventilat
G.3.1.3.14
NC-2009 EAc1:Optimize energy performanceposted by Francesco Passerini on
As baseline model I have to model a System 6.
Prescriptive EnergyEfficiency nApproach
NC-2009 EAc1:Optimize energy performanceposted by J.R. Anderson on
The LEED 2009 v does not specify the level of efficiency for a small office / mixed use building. Only AEDG 2004 is shown specified.
Greenhouse energy consumption
NC-2009 EAc1:Optimize energy performanceposted by Karl Heitman on
We are working on a factory in Chicago which will have food producing greenhouses on the roof.
Efficiency curve
NC-2009 EAc1:Optimize energy performanceposted by Francesco Passerini on
The efficiency of the boiler that I’m modeling has to respect Table 6.8.1F of ASHRAE 90.1:2007.