Forum quick links
Car Park Ventilation Fan Energy Savings
NC-2009 EAc1:Optimize energy performanceposted by Chilufya Lombe on
Hi, on a recent project we were requested to provide evidence that 5 buildings built within the last three years did not have carbon monoxide sensors installed in the basement car parks in order to
BEMwiki
NC-2009 EAc1:Optimize energy performanceposted by Eddy Santosa on
FYI only, I believe this is useful information for LEEDuser community as well.
Modelling Condenser Efficieny in Baseline for LEED
NC-2009 EAc1:Optimize energy performanceposted by heinrich post on
We are modelling a building with water cooled chillers. We are preparing a baseline plant for LEED NC 2009. For the check of necessary plant efficiencies we checked the minimal efficiencies with co
CHP Plant Electricity Generation Credit and Efficiency Calcs
NC-2009 EAc1:Optimize energy performanceposted by MKK LEED on
We are working on a higher ed. project building connected to a campus-wide district heating/cooling and power plant.
Baseline Virtual Energy Rate
NC-2009 EAc1:Optimize energy performanceposted by Nick Morgan on
I am in the process of submitting the LEED templates (2009 NC) for EAp2/EAc1. The building in question has been modeled using Energy Pro and has calculated a baseline virtual energy rate for natur
"DES Energy Cost" Thread Follow-Up
NC-2009 EAc1:Optimize energy performanceposted by Joseph Chappell on
In a previous post titled "DES Energy Cost" dating back to May 13, 2013, my interpretation of the responses in the thread is that a project can choose to either follow 90.1 or the DES Guidance from
Preassure drop adjustment
NC-2009 EAc1:Optimize energy performanceposted by Jorge Lopez de Obeso on
Hello everyone, we are working on a laboratory and we have very restrictive filtering in some spaces there are equipments that have MERV 7 + MERV 13 + MERV16 filtering sections. In the ASHRAE preas
Spreadsheet for Data Centers
NC-2009 EAc1:Optimize energy performanceposted by Ricardo Marques on
Hi, I can´t find the spreadsheet “A Data Center Power Train 1-150170-11A”. I want the latest version the spreadsheet available.
Seeking feedback for denied credit
NC-2009 EAc1:Optimize energy performanceposted by Brian Harris on
Please see below for comments from USGBC relative to our design submittal for Portland Fire & Rescue Station 21 (1000020729). We've sent inquires to USGBC several times with no response.