High Energy Testing Equipment
NC-2009 EAc1:Optimize energy performanceposted by Joel Simonyak on
We are including a r&d / manufacturing space within our LEED project boundary that includes several pieces of testing equipment & support spaces which provide necessary conditions to comple
Greenhouse as part of energy modeling?
NC-2009 EAc1:Optimize energy performanceposted by Karl Heitman on
We are currently working on a industrial building where the owner has a plan to lease out the roof area for greenhouse food production.
Mixed Use Residential Baseline 90.1-2004
NC-2009 EAc1:Optimize energy performanceposted by Ruben Porter on
*Moved to NCv2.2 Credit EAp2
Partial Existing Envelope
NC-2009 EAc1:Optimize energy performanceposted by Clint Whitney on
I'm performing an energy model that is a renovation of an existing structure. The existing structure has a sheet metal roof, two vertical sheet metal walls, and 4" concrete slab.
percentage of vertical fenestration
NC-2009 EAc1:Optimize energy performanceposted by Francesco Passerini on
I have a doubt concerning the percentage of vertical fenestration I have to consider for Table G3.1 5.c. Let me give you an example.
Soladigm Glass
NC-2009 EAc1:Optimize energy performanceposted by Tammy George on
We have a project where we are using Soladigm Dynamic Glass which automatically tints the window based on how sunny it is using photosensors on each face of the building.
Base Building for a mixed use project
NC-2009 EAc1:Optimize energy performanceposted by Graciela Carrillo on
We have a project that is a mix-used 23,000 SF bldg. The lower story is commercial (8,000 SF) and 2-stories of residential (15,000 SF).
DES Option 2 when project contains the DES
NC-2009 EAc1:Optimize energy performanceposted by Stephanie Graham on
Project is LEED-NC v2009 project in which a building contains a DES that serves the project building as well as a larger adjacent building.