Process loads different between proposed & baseline designs
NC-2009 EAc1:Optimize energy performanceposted by Santiago Rodriguez on
For a major renovation of a restaurant they have made a major substitution of old kitchen appliances to new, more efficient equipment.
U-Factor for Vertical Fenestration
NC-2009 EAc1:Optimize energy performanceposted by TOMAS URIBE on
Hello, We are wondering if it is possible to perform a detailed simulation using the LBNL (Lawrence Berkeley National Lab) Windows Software to comply with the Fenestration Assembly U-Factor. Than
Energy modeling for an industrial facility
NC-2009 EAc1:Optimize energy performanceposted by Mohamed M. Abd Elhameed on
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans.
Energy Modeling with California T24-2008
NC-2009 EAc1:Optimize energy performanceposted by eileen hughes on
Will the GBCI accept the model if it is completed based on Title 24 -2008 energy standard in lieu of the T24-2005 or ASHRAE 90.1-2007?
G3.1.3.13 of ASHRAE 90.1-2007
NC-2009 EAc1:Optimize energy performanceposted by Francesco Passerini on
I'm modeling a baseline model (System 5) and I have to apply G3.1.3.13 of ASHRAE 90.1-2007: "Minimum volume setpoints for VAV reheat boxes shall be 2.15 l/s*m^2 of floor area served or the minimum
EAc1 Design Review Question - Seeking Guidance ASAP
NC-2009 EAc1:Optimize energy performanceposted by Joshua Bloom on
If I submit EAc1 in my design review and it gets sent back as likely approved, can I still have the ability to change some things before I submit again for Construction Review?
Preassure drop adjustment
NC-2009 EAc1:Optimize energy performanceposted by Jorge Lopez de Obeso on
Hello everyone, we are working on a laboratory and we have very restrictive filtering in some spaces there are equipments that have MERV 7 + MERV 13 + MERV16 filtering sections. In the ASHRAE preas
CHP Electric Output
NC-2009 EAc1:Optimize energy performanceposted by Francesco Passerini on
I have some doubts concerning Appendix D of the document “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction” http://www.usgbc.org/ShowFile.aspx?Doc
Exterior lighting artwork - Process Load
NC-2009 EAc1:Optimize energy performanceposted by Victoria Watson on
Hi, I am working on a project where they are proposing a lighting installation forming a piece of artwork. They are asking whether it can be excluded from the LEED calcs.