NC-2009 EAc2:On-site renewable energyposted by SAMY Chamy on
Dear all our project is located in a rural area. then agriculture waste (Biomass) is available in anywhere near our site.
Doubts in Green power & REC
NC-2009 EAc2:On-site renewable energyposted by SAMY Chamy on
Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the
Allocating Green-e Certified power to EAc2 and EA6
NC-2009 EAc2:On-site renewable energyposted by Adam Prince on
We have a LEED NC project in Massachusetts (Office space with 2 residential units above). On the roof will be a PV system producing just over 50% of the buildings total energy consumption.
Solar Panel Energy Savings
NC-2009 EAc2:On-site renewable energyposted by DILIP bussa on
hello Marcus, i am currently designing a navy lodge and it is 66,420 sq ft.its a Four floor building with 12 guestrooms on each floor about 900 sq.
Applicable for On-Site Renewable credit?
NC-2009 EAc2:On-site renewable energyposted by Jeff H. on
My company is considering a geothermal system for an industrial facility.
EAC2 in a Positive Energy Building
NC-2009 EAc2:On-site renewable energyposted by Milena Rafols Salvador on
We are certifying a Positive Energy Building, that will produce 130% of its energy consumption with solar PV. All the energy produced with the PV will be sold to the grid.
Renewable energy fraction; with or without process energy?
NC-2009 EAc2:On-site renewable energyposted by Roberto Oshiro Gama on
Hi, I have a question about the renewable energy fraction. For a industry, the renewable energy fraction must be considered as a fraction of total energy demand or as a fraction of tolal energy wit
Solar PV System Degradation
NC-2009 EAc2:On-site renewable energyposted by Katherine Ann Resurreccion on
Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year.
Can Low missission gas generator qualify for EAc2?
NC-2009 EAc2:On-site renewable energyposted by Mahbuba Khan AIA, LEED AP BD+C on
I am doing a factory building in Dhaka Bangladesh. To offset the power outage, they are going to use gas generator.