Forum quick links
Pellets
NC-2009 EAc2:On-site renewable energyposted by Emmanuel Pauwels on
Would pellets made of mill residue be considered as renewable for this credit considering the fabrication process of pellets involves a chemical and/or physical treatment?
Activity Generated Electricity from a Manufacturing process
NC-2009 EAc2:On-site renewable energyposted by Kendal Neitzke on
Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors.
Splitting credit for renewable energy to 2 different buildings?
NC-2009 EAc2:On-site renewable energyposted by Renee Shirey on
We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.
Clarification on Solar Hot Water system eligibility
NC-2009 EAc2:On-site renewable energyposted by Sasha Peters on
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.
EA Credit 2
NC-2009 EAc2:On-site renewable energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Projected Biomass Boiler
NC-2009 EAc2:On-site renewable energyposted by Jose Salinas on
Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust.
Probability distribution of annual PV production.
NC-2009 EAc2:On-site renewable energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.
Owner Agent required information
NC-2009 EAc2:On-site renewable energyposted by Francisco Villela on
Marcus, I am looking at the on-line form for EAc2 On-Site Renewable Energy. (LEED 2009 for New Construction) The asterisk occurs after each of two Required Signatory boxes.
PV's special rate
NC-2009 EAc2:On-site renewable energyposted by Michela Tedeschi on
Hello all, As I understand, all the energy produced by photovoltaic panels which is not used for the building (then fed into the grid) can not be counted for the purposes of credit EAC2.