Forum quick links
2 different system in LEED Boundary
NC-2009 IEQp1:Minimum indoor air quality performanceposted by SW LEE on
Hi, In our project, we have 2 different ventilation system.
IEQP1_Sample Letter of Appeal
NC-2009 IEQp1:Minimum indoor air quality performanceposted by susan eguia on
Hi, Is anyone whom could share sample template for appeal to USGBC. Also, what is the fastest way to contact the assigned reviewer for the project aside from feedback. Appreciate any assistance.
Zone Calculation Ds% for VAV System
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Marina Andrade on
I received this question in IEQp1: "The ventilation calculations indicate that the value of the flow rate of air projected under the condition tested (DS) was modeled as 100% level for each of th
Administrative Wing of Industrial Facility
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Lorena Moscoso on
Dear all: There is an administrative wing of an industrial facility and my questions are: 1.
PAUs not serve the occupied areas
NC-2009 IEQp1:Minimum indoor air quality performanceposted by study topenergy on
A data center is applying for LEED-NC v2009. There are 5 PAUs (Primary Air Unit). 4 of them will serve the equipment rooms. One will serve the equipement rooms and office areas.
source of air for mechanical Ventilation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
We have a project that is natural ventilated in perimeter spaces (circulations and cafe dining rooms), and It is mechanical ventilated in core spaces (meeting rooms and cafe dining room) that is pu
VRP Compliance Calculator or 62MZCalc for projects outside U.S.?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Geraldo Pithon on
I am submitting for review a project outside the US, in Brazil. The legislation of Brazil is very similar to that specified by ASHRAE 62.1.
walk-in closets in residential
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Alfonzo Collins on
I would like to know if there's any way I can consider walk-in closets in a residential building as unoccupied spaces.
Core & Shell tenant retail space in mixed-use building
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Erica Downs on
Our project is a high-rise apartment building with C&S retail on the ground floor.
Which Standard to use?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by RYAN BEN SABILALA on
A WELL certification will be pursued and the project was registered to LEED v2009. IEQ Prerequisite 1 Option 1 will be in line with ASHRAE 62.1-2007.