Forum quick links
IEQp1
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Gordon Nielson on
I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms.
source of air for mechanical Ventilation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
We have a project that is natural ventilated in perimeter spaces (circulations and cafe dining rooms), and It is mechanical ventilated in core spaces (meeting rooms and cafe dining room) that is pu
VRP Compliance Calculator or 62MZCalc for projects outside U.S.?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Geraldo Pithon on
I am submitting for review a project outside the US, in Brazil. The legislation of Brazil is very similar to that specified by ASHRAE 62.1.
Parking ventilation/exhaust
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Charalampos Giannikopoulos on
As per ASHRAE 62.1 parking areas are subject to requirements for exhaust air and not ventilation rates. Accordingly, parking areas are not included in IEQp1, are they? Thanks in advance!
Restroom ventilation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Alexia Anastassiadis on
We are working on a major renovation project and the restrooms have natural ventilation. Do we have to provide additional mechanical exhaust to comply with ASHRAE?
Natural Roof Top Ventilator
NC-2009 IEQp1:Minimum indoor air quality performanceposted by SAMY Chamy on
Dear Concern:- The proposed project consist of 200000 sq.ft area in a single space It is totally metal building the roof top have natural ventilators and the exterior wall have louvers in all sid
2 different system in LEED Boundary
NC-2009 IEQp1:Minimum indoor air quality performanceposted by SW LEE on
Hi, In our project, we have 2 different ventilation system.
IEQP1_Sample Letter of Appeal
NC-2009 IEQp1:Minimum indoor air quality performanceposted by susan eguia on
Hi, Is anyone whom could share sample template for appeal to USGBC. Also, what is the fastest way to contact the assigned reviewer for the project aside from feedback. Appreciate any assistance.
Zone Calculation Ds% for VAV System
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Marina Andrade on
I received this question in IEQp1: "The ventilation calculations indicate that the value of the flow rate of air projected under the condition tested (DS) was modeled as 100% level for each of th
Administrative Wing of Industrial Facility
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Lorena Moscoso on
Dear all: There is an administrative wing of an industrial facility and my questions are: 1.