IAQ Testing - Maximum Concentrations

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Donald Green  on 

Can anyone tell me where the Maximum Concentrations listed in the reference guide came from? Who established them, is there a document or website that can be visited? Thank you,

4
Mon May 5, 2014, 7:49 pm

IEQc3.2 Option 2: Air Testing

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Christopher Strunk  on 

Currently doing a LEED v.2009 project and are looking to pursue IEQc3.2, Option 2. We got a question from the air quality tester asking about the specific requirements for testing.

2
Default Avatar
LEED AP (O+M)
4 Elements Group
LEEDuser Basic Member
34 thumbs up
Tue Apr 29, 2014, 7:11 pm

Do all units have to run at 100% OA for this credit?

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Saju Varghese  on 

We have 4 A/C Units providing air conditioning to a building, two of them are 100% OA units and two of them are providing the total air supply cfm (OA + recirulated air) is 7000 cfm and 8600 respec

4
Mon Apr 21, 2014, 9:40 pm
8
Wed Apr 16, 2014, 6:26 am

Option 2 fails TVOC - will Retest Pass?

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Sandi Carney  on 

I was the responsible party who ran the baseline IAQ testing event a a newly constructed 6,000 SF teaching facility. The TVOC results came back yesterday and were 4,900 ug/m3.

6
Wed Mar 12, 2014, 4:11 pm

Air Sampling

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Farah A.  on 

If a building is 25,000 sq feet, does that mean only one air sample needs to be taken? Or is it more dependant upon the number of HVAC systems/building area?

7
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed Mar 5, 2014, 12:02 pm

Definition contiguous floor area

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Lise Dannesboe  on 

Hi! I was wondering how to interpret the term "contiguous floor area" in IEQ CREDIT 3.2 Option 2 Air Testing.

5
Sustainability Manager
COWI
LEEDuser Premium Member
54 thumbs up
Thu Feb 13, 2014, 4:12 pm

Flush out and data center

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Lise Dannesboe  on 

We are pursuing option 1 Flush Out. Our building includes a large datacenter.

6
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Fri Dec 27, 2013, 3:54 pm

Flush out in a Warehouse

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Paula Hernandez  on 

Hello to everyboty and Merry Christmas, I have to make the flush out in a building which is mostly a Warehouse, that will be regularly occupied, with mechanical ventilation but no air conditioning.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Dec 26, 2013, 5:52 pm

air testing in a mechanical room??

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Carrie Laurendine  on 

1) Do mechanical rooms need air quality testing? 2) There is an air handler unit that supplies air to multiple floors.

2
Mon Nov 18, 2013, 11:00 pm