Construction IAQ management plan - before occupancy
Filter by location
Forum
Topic
Replies
Recent

Flush out in tropical climate region (Climate Zone 1)

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Adi Negara, LEED AP BD+C  on 

Hello, Our project is in Indonesia (Climate Zone 1), which happened have high humidity (70-85%) all year long. Our building design only incorporate natural ventilation and AC (VRF system).

0

Concerning Carpet

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Omar Elrawy  on 

Dear all, We have a project where we intend to pursue Option 1 Path 1, We will install furniture after completing the flush-out, but the architect is concerned about the carpet install

1
Thu Jul 3, 2014, 8:08 am

IAQ Testing using screening tool.

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Marcia Weekes  on 

Has anyone had experience with meeting the IAQ testing requirements using the Directsense IAQ Plus Screening tool from Graywolf Sensing Solutions.

1
Wed Apr 13, 2016, 8:09 am

Flushout of Nonoccupied Spaces

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Sally Marr  on 

The 26,000 square foot building that I am working on has several spaces that are not served with supply air by the building's ventilation system, including toilet rooms and mechanical and electrica

1
Fri Mar 15, 2013, 4:06 pm

Apparatus Bay Flush out

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Richard Naldrett  on 

We have a Fire Station project scheduled for a flush out of the Appratus Bay. The space has heating but there is not a simple way to control humidity.

1
Wed Sep 18, 2013, 3:41 pm

IAQ Flush out-using temporary exhaust systems

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Stella Stella  on 

Hi, We are proposing a IAQ flush out procedure for our facility which consist of a lot of FCU’s. Due to the FCU’s the flush out procedure is excessively long.

0

Do non-regularly occupied spaces have to be air tested?

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  David Groseclose  on 

Hello, if you go for option 2, and conduct an air testing in a lab building, do you also need to do the testing in Non- Regularly occupied spaces, such as carpark, toilets, mechanical rooms, etc?

1
Wed May 1, 2013, 2:24 am

IBC Occupancy Classification & Testing Requirements

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Zach Hoffman  on 

I am wondering if IBC Group S-1 Occupancy zones are required to be tested per IEQc3.2. On this project (vehicle maintenance facility), the specific zones within the S-1 classification are maintenan

1
Sat May 17, 2014, 3:42 am

Natural Ventilation

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Benjamin Cullum  on 

Under option 2 How do you determine how many sampling stations are needed in a building that is uses Natural ventilation?

1
Thu Mar 19, 2015, 10:46 pm

Upload IEQc3.2-1. Provide the IAQ Management Plan...

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Zach Hoffman  on 

Hello, I have been successfully completing IAQ Testing under Option 2 for a few years now and always wondered about this section of the credit template.

1
Wed May 13, 2015, 6:40 pm