Forum quick links
Robotic Parking Garage Ventilation
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Gabriela Mena on
Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf
MERV Filter during and after Test run
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Yong Lee Low on
Regarding the MERV filter, I had advised the M&E the LEED Requirements and he has replied as "During the test run period (80days), the MERV 8 will be installed on the AHU, PAH & VRF Indoor
Access Panel in Hard Lid Ceiling
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Ralph Bicknese on
Our janitor rooms do not have deck-to deck partitions.
Shoe removal and storage space in place of walk off mats
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by John Covello on
Hello, I am with a sustainable resort project in Thailand. Our project has designed shoe storage space in the front of each guest room instead of having walk off mats.
High-Volume vs. Convenience Copier 5,000 pages - CIR 872 Canada
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Lindsey Kindrat on
Heads up for those working on LEED Canada NC 2009 projects, CIR 872 ruled 5,000 pages per month as the definition limit for a convenience copier. Ruling provided 2012-06-08.
Garage and technical rooms
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by BH . on
Hello, We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them?
Printers
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Ciaran McCabe on
What happens if the printers are situated with the open plan office - not a dedicated room. Does the printer need to be a particular spec ?
Exhaust rate in retail units.
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by VEL MUTHU on
I am currently working on a project which has 6 retail outlets in a very big building for the users in that building.
LEED Clarification for Filtration Credit Requirements
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Mary Kay on
We've heard that per a recent LEED clarification for filtration credit requirements, MERV 13 filtration is required on ALL outdoor air handling units, not just those serving regularly occupied spac
Rooms to be considered for IEQ C5
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by VEL MUTHU on
I am working on a project which attempts for IEQ C5. When listing the list of rooms to be considered for credit compliance as per LEED V3 (i.e.