Forum quick links
Portfolio Energy Star
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Mercè Llorca on
Hello. We will make the Eap2 by Energy Star. To do this we have invoices for the total consumption of the building (offices + CPD), and manual readings consumption of different meters.
Central Chiller Plant - Chilled Water Btu Metering
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Simon Sue on
A central chiller plant supplies chilled water to our project building and several other buildings.
Data Center Might be Removed (cannot get a commitment) - Issues
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Michelle Bracewell-Musson on
One of 4 fairly identical buildings has a Data Center in 1/3 of it.
EAp2/EAc1 - Case 2 Option 2b
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Peter Locke on
We are submitting a museum bldg and have had confirmation from GBCI that we can use Case 2 - historical data to compare against.
water bills received every 3 months
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Agnieszka Rylska on
Our project receives water bills including water usage every 3 months.
Off-grid Project in Mexico
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Jeremy Kuhre on
We are currently evaluating an off-grid hospitality project in Mexico. The project is primarily powered by a 32kW PV array which is sometimes supplemented by a propane generator.
Facility Summary
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Charalampos Giannikopoulos on
LEED Online requests a copy of the complete Statement of Energy Performance (SEP).When generating the statement, it is noted to make sure to select the following report options: Statement of Energy
1-floor renovation in an 2009 EBOM Certified Building
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by John Krutko on
I am proposing on a project in which the scope is the renovation of a single floor of a 10 story building that is currently LEED 2009 EBOM certified.