Forum quick links
Use CO2 Measurement to meet Prereq Requirement
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Eric Tu on
Hello; Out BAS does not measure air flow (CFM), but, it does measure Return Air and OA C02 values. Can this PreReq be met using CO2 measurement (demand ventilation) rather than CFM?
AHU measurements
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Luis Parada on
In our building we have two main AHU that supply 26 AHU (one for each floor of the building) and then we have VAVs for each zone in each floor. Do I need to perform measurements just in the two ma
Local code more stringent than ASHRAE 62.1
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Andrew Tse on
I noticed that the LEED EBOM form does not have the same compliance path as LEED-NC, which allows you to document that your building complies with local code that is more stringent than ASHRAE 62.1
IAQ Procedure as ASHRAE 62.1 Compliance Path
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Laura Case on
ASHRAE specifies that the Ventilation Rate Procedure or the IAQ Procedure can be used to ensure that mechanical ventilation systems meet ventilation requirements in ASHRAE 62.1 (Section 6.1).
estimating system Ds
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by AAME User on
Hello All, I have a building where we are performing calcs on a select number of assumed potential critical zones as opposed to every zone.
New requirements in Version 5.0 form for LEED-EB: O&M v3/2009?
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Peter Dahl on
I’m seeing Version 5.0 of the IEQp1 form for LEED-EB: O&M appear in some of my projects.
Type and sub-type area matrix IEQ EBOM
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Hector Miranda on
I have a question if a have in an EBOM project and this project isn´t an industrial facilities area ,but I have much inactive storage, is the space not included in the IEQp1 credit requirements?
Can ebom 2009 use IEQp1 v3 forms?
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by James Doyle on
Our EBOM 2009 project (registered in late 2011 or early 2012) Score Card indicates that for IEQp1 we are to use the v4 form.
AHUs unable to meet case 1 or case 2
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Patrick Murisset on
Hello. I coordinated a project in which the IEQp1 was audited.