Lighting Compliance - 2003 - Texas

CI-2009 EAp2:Minimum energy performance
posted by  Jamie Angulo  on 

Our restaraunt is about 50% over the current allowed wattages. What can we do to drop it? Does 'graphical lighting' have to be counted in the total?

1
Wed Oct 5, 2011, 5:44 pm

Modified AHU

CI-2009 EAp2:Minimum energy performance
posted by  Silvia Ruiz  on 

Hi, If an AHU (initially outside of the scope of work) had to be modified in order to comply with the ventilation requirements of Standard 62.1-2007, does it have to comply with the requirements

0

Process Energy

CI-2009 EAp2:Minimum energy performance
posted by  Graham Langton  on 

All, How does LEED CI and section 11 modelling view process energy? For an industrial / manufacturing facility with new process equipment in particular. In 90.1, process energy is not dealt with.

1
Thu Nov 14, 2013, 6:02 pm
1
Fri Nov 20, 2009, 4:19 pm

EAc1 required 2 points

CI-2009 EAp2:Minimum energy performance
posted by  Jennifer Berthelot-Jelovic  on 

I know that for EAc1 there was a requirement that "All LEED for New Construction project registered after June 26, 2007 are required to achieve at least two (2) points." Since I am working on a LEE

1
Wed Mar 23, 2011, 9:05 pm

Complicated HVAC situation in a CI 2009 project.

CI-2009 EAp2:Minimum energy performance
posted by  Susan Di Giulio  on 

We are working on a CI project which occupies portions of four floors in a University Medical Research Building.

0

EA Prerequisite 2

CI-2009 EAp2:Minimum energy performance
posted by  Poorva Keskar  on 

In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.

1
Fri Feb 19, 2016, 4:10 pm
1
Thu Jul 8, 2010, 5:42 pm

Building Over Hang

CI-2009 EAp2:Minimum energy performance
posted by  Simon Sue  on 

We working on a commercial bank and calculating the installed LPD in the project space. The commercial bank has a overhang on the 1st floor and is included in our LEED boundary.

1
Fri Jul 22, 2011, 9:00 pm

No Design Engineer

CI-2009 EAp2:Minimum energy performance
posted by  Paul Meyer, PE, CEM, CBCP, GBE LEED AP  on 

Currently working on a project in which all HVAC mechanical systems were existing. Only the ductwork was installed.

1
Mon Jan 2, 2012, 4:38 pm