Energy Star equipment

CI-2009 EAp2:Minimum energy performance
posted by  mingyu Zhang  on 

Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.

1
Tue Aug 16, 2016, 3:02 pm
1
Thu Jul 8, 2010, 5:42 pm

Building Over Hang

CI-2009 EAp2:Minimum energy performance
posted by  Simon Sue  on 

We working on a commercial bank and calculating the installed LPD in the project space. The commercial bank has a overhang on the 1st floor and is included in our LEED boundary.

1
Fri Jul 22, 2011, 9:00 pm

No Design Engineer

CI-2009 EAp2:Minimum energy performance
posted by  Paul Meyer, PE, CEM, CBCP, GBE LEED AP  on 

Currently working on a project in which all HVAC mechanical systems were existing. Only the ductwork was installed.

1
Mon Jan 2, 2012, 4:38 pm

Lighting load synergy in EAp2 and EAc1.2

CI-2009 EAp2:Minimum energy performance
posted by  Saju Varghese  on 

Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?

1
Thu Aug 8, 2013, 2:58 pm

ID+C v4 - Existing Office Building: Lighitng & Envelope

CI-2009 EAp2:Minimum energy performance
posted by  Marc Maso  on 

We are doing a ID+C in a existing building, where the lighting and the envelope are the original ones.

3
Mon May 1, 2017, 2:04 pm

Basecase System Modeling

CI-2009 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Dear All:- Greetings Currently we are working in LEED CI - office project The Building served with 5 no VRF and 2 no of Split A/c so we consider 7 no of systems so we have clarifications in m

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Fri Jan 27, 2017, 2:48 pm

Equipment relocation

CI-2009 EAp2:Minimum energy performance
posted by  Charalampos Giannikopoulos  on 

For a project relocation which may relocate existing equipment accordingly could this equipment be excluded from calculations as this has been purchased previously?

3
Tue Oct 11, 2016, 4:03 pm

Energy modeling

CI-2009 EAp2:Minimum energy performance
posted by  Charalampos Giannikopoulos  on 

Would energy modeling according to EAc1.3 requirements be a way to comply with EAp2? If yes, what would be the minimum percentage of improvement required?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Sep 19, 2016, 3:00 pm

Energy Star Equipment / Appliances

CI-2009 EAp2:Minimum energy performance
posted by  Catherine Blakemore  on 

Does this include things like 2/4 slice bread toasters and drip coffee makers?

6
Mon Sep 12, 2016, 4:19 pm