Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.
Entering "total project space equipment capacity" - LEED form
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Seema Pandya on
In the LEED Online form for option 1 section 1.4: Mechanical System Design Criteria, there is a place for you to enter the total space loads for heating and cooling and another entry that asks for
accounting for equipment not listed in CPG tables
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Keith Amann on
The Core Performance Guide, and it's reference standard (Consortium for Energy Efficiency Commercial Unitary AC and HP Specification) has no standard for large (760 kbtu/h) systems.
Partial Load Calculations & Fan Sizing
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Nick Chiarelli on
Hello, This project is 12 floors served by base building AHU's, pumps, chillers, etc.
Energy modeling
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Muzammal Abbas on
Dear Sir, I want to know that is it mandatory to provide energy modeling for commercial interior project's for LEED submission, Now my second question is that i am using a HAP 4.8 and eQUEST softwa
Detailed Plant Simulation
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Chilufya Lombe on
Hi, we have a project with a certain number of 'back up' systems for air conditioning.
active control for private offices
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Mark Taake on
I'm beginning to think that in many cases the private office active control requirement can be made to work for a VAV system only if each office has a separate motorized damper in the supply duct s
Datacentre Requirements
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.