Forum quick links
Do we need to document out of scope HVAC equipment?
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Silvia Ruiz on
I am working on a project where all of the AHUs, except for one, are provided by the building owner.
Appropriate Zoning and Controls Questions
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Patrick Salmon on
We have an open office VAV project that is only pursuing the "Appropriate Zoning and Controls" portion of Option 1.
solar exposure
CI-2009 EAc1.3:Optimize energy performance - HVACposted by gustavo goldman on
The building has one of the facades facing east-south. There are trees at street level that block the sun.
Demonstrate Savings for CRAC Units
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Gabriela Crespo on
Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.
ECB vs Appendix G
CI-2009 EAc1.3:Optimize energy performance - HVACposted by MKK LEED on
I am trying to understand whether the modelling for Option 2 of this credit is supposed to be done using the ECB method or Appendix G.
Question
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Mario Leonhardt on
Can the LEED-CI certificate be obtained even after the renovation process has been completed? There has been no registrations or whatsoever before the renovation/construction.
Compliance with Core Performance Guide Sections
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Ron Dean on
Hello everyone, I'm working in a smal project (just 2 floors) that is naturally ventilated overall.
Option 1: Zoning and controls
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Ricardo Sá on
Hi, The project is basically a huge sales area with some office spaces.The sales area is served by multiple compact rooftop units and the office areas are served by DOA´s for ventilation purposes