phased flushing for hospital project

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Ed Clark  on 

Due to phasing plan the contractor will need to run AHU prior to completion of another phase of the project.

1
Fri Oct 21, 2011, 5:29 pm

Documentation for a big project

NC-2009 IEQc7.1:Thermal comfort - design
posted by  Veronika Sundberg  on 

Hi, im working in version 4.0 of this credit template.

1
Thu Dec 8, 2011, 2:30 pm

Alternative Sources of Water

NC-2009 WEc1:Water efficient landscaping
posted by  Omer Moltay  on 

Can the following types of water, if stored in a rainwater cistern, contribute to credit compliance? - Water from building foundations (dewatering) pumped into the rainwater cistern, - AC condensa

1
Tue Oct 25, 2011, 4:06 pm

Timing

EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysis
posted by  Jessica Bruscato  on 

I am pursuing certification for an existing convention center that is connected to a hotel. The hotel has a central plant that serves the convention center.

1
Mon Dec 5, 2011, 12:36 pm

Residential HVAC included in commissioning scope of LEED CS?

CS-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Jorng-ren Chern  on 

I am working on a condominium project which is planning to certify LEED CS.

1
Mon Nov 21, 2011, 5:22 am

ANTE Room

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Omar Elrawy  on 

I'd like to know if I can fulfill the prerequisite, without constructing an ANTEROOM? and if a double door can be an acceptable alternative or not? thanks

1
Tue Nov 15, 2011, 4:03 pm

Option 3 - Whole Building Reporting / Energy Star PM

NC-2009 EAc5:Measurement and verification
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

Energy Star Portfolio Manager does not cover all building types.

1
Tue Oct 25, 2011, 3:35 pm

Using Portfolio Manager: area to consider

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Marcio Alberto Casado Pereira  on 

We are experiencing difficulties in acquiring a coherent rating from Portfolio Manager for a Hospital in São Paulo, Brazil.

1
Sun Nov 20, 2011, 3:31 pm

Not Eligible for ENERGY STAR rating- Case 2 option 1 calculator

EBOM-2009 EAc1:Optimize energy efficiency performance
posted by  gwenedd murray  on 

Our project is below 5,000sf which makes it automatically not eligible for an ENERGY STAR rating. There are two distinct space types, office + K-12 classroom.

1
Sun Nov 20, 2011, 3:42 pm

Hazardous Waste being recycled

NC-2009 MRc2:Construction waste management
posted by  Paola Figueiredo  on 

Hello, It is clear that hazardous waste is to be excluded from MR2 calculations "and should be disposed of according to relevant regulations" (LEED NC v3 Reference Guide, p.359). This makes perfe

1
Tue Nov 22, 2011, 5:16 am